My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-241A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-241A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:04:20 AM
Creation date
1/11/2016 11:38:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-241A
Agenda Item Number
8.L.
Entity Name
West Construction Inc.
Subject
Contrac and Specifications
Skeet and Trap Facility Improvements
Indian River Count Public Shooting Range
Area
Indian River County Public Shooting Range
Project Number
1213B
Bid Number
2016008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTIONS AND RESPONSES/CLARIFICATIONS <br />QUESTION NO. 1 <br />On Sheet P2.1 it states the discharge pipe coming off the sump pit pump is to "Discharge <br />above grade. See Civil for details." After review of civils, I do not see any indication of <br />where we are to terminate the discharge pipe. Please provide clarification or distance <br />and direction from Trap Houses to point of termination of discharge pipe. <br />ANSWER NO. 1 <br />Discharge pipe from sump pit pump shall be taken 5 feet outside the building to the <br />east; extended 8 inches to 12 inches above grade with a 180 degree bend at the top. <br />Provide a 24 inch by 24 inch concrete splash block at the discharge location. <br />QUESTION NO. 2 <br />Are we allowed to burn land clearing debris on site? If so are there any <br />limitations/restrictions? <br />ANSWER NO. 2 <br />There shall be no burning of land clearing debris. All debris shall be hauled off site and <br />properly disposed of. <br />QUESTION NO. 3 <br />After the site visit it appears there is a power pole tight to the new drive throat coming <br />off the existing parking lot and the guide wire is definitely in conflict of the new paving. <br />During prebid meeting it was stated by IRC staff that we were not to concern ourselves <br />with anything related to the electrical service provider. Please confirm that IRC and not <br />the bidders shall take care of any relocation conflicts mentioned above. <br />ANSWER NO. 3 <br />The County will contact FP & L to have the guy wires relocated. <br />Page 2 of 9 <br />CAUserAjwilliamslApp ola\Local1Mic Oso€11Wiindownrmyorary Internet FiksTccoc tt.CutioaNDNK8007MAddendum No .dac <br />
The URL can be used to link to this page
Your browser does not support the video tag.