Laserfiche WebLink
QUESTION NO. 4 <br />Is there any requirement for below grade waterproofing of the Trap House structures? <br />See none called for on plans. <br />ANSWER NO. 4 <br />See Section 07141— Cold Fluid — Applied Waterproofing for Trap House Structure below <br />Grade Waterproofing. <br />QUESTION NO. 5 <br />Regarding the drainage pipe. Could all pipe be RCP? With the small amount of CMP it <br />would be just as easy and cost effective to bid as RCP. <br />ANSWER NO. 5 <br />Please bid the pipe as specified on the plans and in the Contract Documents. <br />QUESTION NO. 6 <br />It was mentioned at the site meeting that we would not be able to burn the cleared <br />debris. Would we be able to grind the debris and leave the "mulch" stockpiled for use <br />on-site? <br />ANSWER NO. 6 <br />See Answer No. 2 regarding burning. All debris must be hauled off site and properly <br />disposed of. <br />QUESTION NO. 7 <br />If the owner is responsible for testing, that- what is the notification procedure? <br />Page 3 of 9 <br />CAUsersljwilliamAAppDatilocal Microsoft lWlndowslTempora y lre met Fiies1Conti:nt.CutloaklDA3K80071Addcndum Na 3.dac <br />