Laserfiche WebLink
ANSWER NO.7 <br />Review Section 01215 of the General Requirements for owner responsibility for testing. <br />The Contractor shall request testing through the County Resident Construction <br />Inspector a minimum of 48 hours prior to the need for testing. The County Resident <br />Construction Inspector will schedule all tests for the site work. <br />QUESTION NO. 8 <br />Will the contractor be responsible for standby time? <br />ANSWER NO. 8 <br />This question is incomplete as to the circumstance for standby time. If this pertains to <br />standby time for testing, then yes the Contractor will be responsible for charges from <br />the testing lab to the County for standby time/trip charges resulting from the Contractor <br />not be ready for testing when the testing lab arrives at the site at the time requested by <br />the Contractor. <br />QUESTION NO. 9 <br />If so how will the contractor know that the testing agency is on standby time? <br />ANSWER NO. 9 <br />The County Resident Construction Inspector will so notify the Contractor. <br />QUESTION NO. 10 <br />Will the testing lab notify the contractor with a ticket of the time he/she was on <br />standby? <br />ANSWER NO. 10 <br />No they will not. See Answer No. 9 <br />Page 4 of 9 <br />CAUsenAiwilliamAAppDataV.ocgMitrowfllWindawslTemporary Iratrni! FilalContaA.Outlook\DA3K8007AddcndumNo 3 duc <br />