My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-241A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-241A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:04:20 AM
Creation date
1/11/2016 11:38:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-241A
Agenda Item Number
8.L.
Entity Name
West Construction Inc.
Subject
Contrac and Specifications
Skeet and Trap Facility Improvements
Indian River Count Public Shooting Range
Area
Indian River County Public Shooting Range
Project Number
1213B
Bid Number
2016008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 11 <br />If so what would be the rate to be back charged to the contractor for failed tests and/or <br />standby time? <br />ANSWER NO. 11 <br />The County has set hourly rates and testing rates for each testing lab under continuing <br />contract with the County. These rates will be available to the successful bidder at the <br />time the County contracts with the testing lab that will perform work on this particular <br />project. <br />QUESTION NO. 12 <br />What are the permit fees for the project? <br />ANSWER NO. 12 <br />The contractor is responsible to obtain a DEP NPDES (N01) permit for the project. The <br />permit fee is $400.00 and is to be included in Item No. 104-1, Erosion & Water Pollution <br />Controls/NPDES Compliance, of the Itemized Bid Schedule. <br />The permit fee for the building permit will be paid by the County. The contractor is not <br />responsible for the building permit fee. <br />QUESTION NO. 13 <br />Section 1 of the Technical Specifications states " All work of this contract shall conform <br />to the technical specifications of the Florida Department of Transportation for Road and <br />Bridge Construction, 2015,etc.", if there is a conflict between the FDOT Specifications, <br />the Division 2 Technical Specifications, and any other specifications listed in the bid <br />documents, which shall be enforceable? <br />ANSWER NO. 13 <br />Please review Section 01091, Reference Standards, 1.1 (D) of the General Requirements. <br />Page S of 9 <br />CAUserAjwilliimsuppDuaV.ocaltM;crosoft Windows\ Temporary Internet Fila\Contcnt.OadlooklDA3K600TAddendum No 3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.