Laserfiche WebLink
QUESTION NO. 14 <br />If the enforceable specification shall be the "strictest specification", how will that be <br />determined? <br />ANSWER NO. 14 <br />This will be determined by the Engineer of Record and the County Engineer. <br />QUESTION NO. 15 <br />Who will be the " Resident Engineer" for this project? <br />ANSWER NO. 15 <br />Per Section 1—Technical Specification, Standard Specification (A), the word "Resident <br />Engineer" shall be taken to mean an authorized representative of the owners engineer <br />on the project (Resident Construction Inspector) who will act as an agent for Indian • <br />River County. At this time, a Resident Construction Inspector has not been assigned to <br />the project. <br />QUESTION NO. 16 <br />What is the cure period for the asphalt/concrete before thermoplastic striping (28 <br />Days)? <br />ANSWER NO. 16 <br />The cure period will be 14 -days per the 2015 FDOT Standard Specifications for Road and <br />Bridge Construction. <br />QUESTION NO. 17 <br />Will thermoplastic striping be considered a punchlist item? <br />ANSWER NO. 17 <br />No. All striping shall be installed prior to a request for substantial completion. <br />Page 6 of 9 <br />c•ustAiwilliamskAppD.A.. ri microwftlWindawia.rric(ary Internet Fila\Cxtpu.0utlook\DA3K8007Vdderdum No 3.doc <br />