My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:13:46 AM
Creation date
1/19/2016 10:39:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242A
Agenda Item Number
8.K.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents & Specifications
Old Dixie Highway Resurfacing
Area
71st St. to CR 510 Old Dixie
Project Number
1138
Bid Number
2016001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS / CORRECTIONS/QUESTIONS: <br />1. At the September 30, 2015 Pre-bid meeting, Maintenance of Traffic (MOT) / Detour criteria was <br />discussed. The official detour for the closed portion of Old Dixie Highway shall be at CR 510 to US <br />1 to 69th Street. The road closures for each phase may be done in segments or in its entirety. <br />Access to all businesses, residences, and emergency vehicles shall be maintained at all times. No <br />traffic will be allowed on the new roadway between the time when the asphalt emulsion is <br />injected into the base material and the time when the first lift of asphalt is put down with the <br />exception of the local traffic for the businesses, residences and emergency vehicles. <br />2. SECTION 102 — MAINTENANCE OF TRAFFIC of the Division 2, Technical Specifications in the <br />Contract Document: is hereby amended to include: <br />G. The Changeable Variable Message Sign shall be used as necessary. The location, message, <br />and duration shall be as directed by the Engineer. <br />H. In addition to above, the contractor shall comply with INDIAN RIVER COUNTY TRAFFIC <br />ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF-WAY CONSTRUCTION in <br />Appendix D. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 102-1- Maintenance of Traffic - Lump Sum <br />Bid Item No. 102- 99 - Changeable Variable Message Sign — Per Day <br />(See attached Appendix D included in this addendum) <br />(See the attached revised Itemized Bid Schedule) <br />3. Sheets numbered 54 through 71 inclusive of the Construction Drawings labeled Old Dixie Highway <br />Pavement Markings, Project No. 1138 is hereby amended as follows: <br />Minor revisions were made on the plans. The revised sheets numbered 54 through 71 <br />inclusive are included in this addendum and replaces the original sheets numbered 54 <br />through 71 inclusive in the bid set. <br />Line Items in the Itemized Bid Schedule has been amended as follows: <br />700-1-50 SINGLE SIGN POST (RELOCATION) quantity 9 changed to 14 <br />706-3 RETRO -REFLECTIVE PAVEMENT <br />MARKERS (AMBER/AMBER) quantity 362 changed to 414 <br />711-11-125 THERMOPLASTIC, STANDARD, <br />WHITE, SOLID, 24", FOR STOP LINE quantity 110 changed to 133 <br />711-16-111 THERMOPLASTIC, STANDARD, <br />WHITE, SOLID, 6" quantity 25,679 changed to 31,871 <br />711-16-231 THERMOPLASTIC, STANDARD, <br />YELLOW, SKIP, (10-30), 6" quantity 7,603 changed to 4,063 <br />(See the attached revised Itemized Bid Schedule) <br />(See the attached revised Sheets numbered 54 through 71 inclusive of the Construction Drawings <br />labeled Old Dixie Highway Pavement Markings, Project No. 1138) <br />Page 2 of 7 <br />F\Public Works\ENGINEERING DIVISION PROJECTS\I 138-01d Dixie Hwy Resurfacing-7Ist St to CR 510WdmimWddenda\Addendum No.1, 10-1-15.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.