Laserfiche WebLink
QUESTIONS AND RESPONSES: <br />QUESTION NO. 1 <br />Is silt fencing going to be required for the entire length of the project? <br />ANSWER NO. 1 <br />Per Division 2 - Technical Provisions, Section 104 — Prevention, Control, and Abatement of Erosion and <br />Water Pollution, Part 1— General, Subsection 1.5, it specifically states that before beginning construction, <br />the contactor shall submit to Indian River County for review and approval, a Stormwater Pollution <br />Prevention Plan (SWPPP), prepared by a certified erosion control subcontractor. It is the responsibility of <br />the Contractor to ensure that the SWPPP meets the requirements for erosion control, which may include <br />silt fence along the entire length of the project to meet requirements of County, State, and Federal <br />erosion protection regulations. Additionally, the Contractor is responsible for obtaining an FDEP-NPDES <br />permit as required in Subsection 1.2. <br />Sheets numbered 73 through 81 inclusive of the Construction Drawings labeled Old Dixie Highway <br />SWPPP, Project No. 1138 is hereby amended as follows: <br />Where noted, "INSTALL SILT FENCE" is for informational purposes only. The actual length of silt <br />fence may vary in accordance with Contractor's SWPPP. <br />Line Item 104-10-3 SEDIMENT BARRIER, Unit -LF, Quantity -19,000 (Has been Deleted) <br />Line Item 104-18 INLET PROTECTION, Unit -EA, Quantity -36 (Has been Deleted) <br />Line Item 104-1 EROSION AND WATER POLLUTION CONTROL, Unit -LS, Quantity -1 (Has been <br />added to the ITEMIZED BID SCHEDULE) All work included in Erosion and Water Pollution Control <br />shall be included in this item as lump sum. <br />(See the attached revised Itemized Bid Schedule) <br />QUESTION NO. 2 <br />Does the Type C and Type E Inlets have sumps? <br />ANSWER NO. 2 <br />All Type 'C' and Type 'E' Inlets shall have a 12" sump below the lowest pipe invert <br />QUESTION NO. 3 <br />What is the project estimate? <br />ANSWER NO. 3 <br />The project estimate is $2,750,000.00 <br />Page 3 of 7 <br />F\Public Works\ENGINEERING DIVISION PROJECTS\I 138-01d Dixie Hwy Resurfacing -71st St to CR 510Wdmim\Addenda\Addendum No.1, 10-1-15 doc <br />F'Public Works\ENGINEERING DIVISION PROJECTS\I 138 -Old Dixie Hwy Resurfacing -71st St to CR 510\AdmimlAddenda'Addendum No.1; I0-1-15.doc <br />