My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:13:46 AM
Creation date
1/19/2016 10:39:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242A
Agenda Item Number
8.K.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents & Specifications
Old Dixie Highway Resurfacing
Area
71st St. to CR 510 Old Dixie
Project Number
1138
Bid Number
2016001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANSWER NO. 11 <br />SECTION 285 — OPTIONAL BASE COURSE (FULL DEPTH RECLAMATION), Division Two TECHNICAL <br />SPECIFICATIONS, in the Contract Documents, the first full paragraph on page 01025-28 <br />BASE COURSE DESIGN - The Contractor shall review the core data provided for the existing roadway and <br />shall perform testing and/or coring prior to submitting a Bid to verify that the Cold Recycled Bituminous <br />Base Course Mix Design or the Reclaimed Asphalt Base Course Mix Design, as applicable, has a minimum <br />Structural Number (SN) of 1.8 for the total thickness of the finished/completed base course. The <br />Contractor shall be responsible for preparing Mix Designs for the Cold Recycled Bituminous Base Course <br />Mix Design or the Reclaimed Asphalt Base Course Mix Design, as applicable, prior to the start of <br />construction. The Contractor will also be required to test the completed base course and provide test <br />results that verify that the completed base course meets the specified Structural Number. In the event <br />that the completed reclaimed asphalt base does not meet the minimum Structural Number specified, the <br />County may require corrective work on the base course or the placement of additional asphalt surface <br />course. All Mix Design testing/preparation and testing for verification of the Structural Number shall be <br />performed by an independent testing laboratory and all costs associated with the Mix Design <br />preparation and SN verification testing shall be the responsibility of the Contractor. <br />is hereby amended to read as follows: <br />BASE COURSE DESIGN - The Contractor shall review the core data provided for the existing roadway and <br />shall perform testing and/or coring prior to submitting a Cold Recycled Bituminous Base Course Mix <br />Design or the Reclaimed Asphalt Base Course Mix Design, as applicable, having a minimum Structural <br />Number (SN) of 1.8 for the total thickness of the finished/completed base course. The Contractor shall be <br />responsible for preparing Mix Designs for the Cold Recycled Bituminous Base Course Mix Design or the <br />Reclaimed Asphalt Base Course Mix Design, as applicable, prior to the start of the Full Depth Reclamation <br />process. The Contractor will also be required to test the completed base course and provide test results <br />that verify that the completed base course meets the specified Structural Number. In the event that the <br />completed reclaimed asphalt base does not meet the minimum Structural Number specified, the County <br />may require corrective work on the base course or the placement of additional asphalt surface course. All <br />Mix Design testing/preparation and testing for verification of the Structural Number shall be performed <br />by an independent testing laboratory and all costs associated with the Mix Design preparation and SN <br />verification testing shall be the responsibility of the Contractor. <br />ATTACHMENT: <br />1. Revised: Itemized Bid Schedule <br />2. Pre -Bid Meeting Minutes, September 30, 2015 <br />3. Appendix D, INDIAN RIVER COUNTY TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR <br />RIGHT-OF-WAY CONSTRUCTION. <br />4. Revised Plans Sheets 54 through 71 inclusive (Signing and Markings) of the Construction Drawings. <br />Page 6 of 7 <br />F\Public Works'ENG[NEERING DIVISION PROJECTS 1138 -Old Dixie Hwy Resurfacing -71st St to CR 510Wdmim\Addenda\Addendum No.l, 10-I-15.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.