My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:24:39 AM
Creation date
1/19/2016 11:02:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242B
Agenda Item Number
8.M.
Entity Name
Blue Goose Construction
Subject
Contract Documents & Specifications
34th Avenue Intersection Improvements
Area
1st. St. SW and 43rd Ave.Intersections
Project Number
1232
Bid Number
2016002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 9 <br />Can the Contractor close 1st ST east and west of 43`d to "local traffic only", maintaining continuous <br />vehicular traffic to those local residents in that work area? <br />ANSWER NO. 9 <br />Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic on 1st Street S.W. and <br />43rd Avenue at all times for all traffic. <br />QUESTION NO. 10 <br />Article 1.2 of the Technical Specifications states that the Long Term and/or Short term dewatering permit <br />will be required, St Johns no longer requires this form, and could you please specify the form that is <br />required? <br />ANSWER NO. 10 <br />The form RDS -50 is no longer required by the state nor the requirements of Consumptive Use. The <br />Contractor shall comply with all Federal, State, and local permit conditions for all offsite discharge. <br />QUESTION NO. 11 <br />During water quality sampling if contaminants are encountered will this be viewed as an unforeseen <br />condition and paid as a change order? <br />ANSWER NO. 11 <br />No, if contaminants are encountered during water quality sampling, the County will contact the <br />appropriate agencies to evaluate the contaminants. The Contractor must demonstrate that an <br />undisputed contaminate exists which will require clean up. <br />QUESTION NO. 12 <br />Will recycled concrete aggregate i.e. 57 stone, Rip Rap Rubble be allowed for use on this project? <br />ANSWER NO. 12 <br />Recycled concrete for bedding stone, course aggregate, and rock rubble will be allowed, however, the <br />material will be required to be in accordance with Section 530 of the FDOT Standard Specifications for <br />Road and Bridge Construction 2015. <br />Page 4 of 11 <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1232-Ist St SW_43rd Ave Intersec Improv\Admim\Addendums\Addendum No. 1 10.21-15.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.