My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:24:39 AM
Creation date
1/19/2016 11:02:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242B
Agenda Item Number
8.M.
Entity Name
Blue Goose Construction
Subject
Contract Documents & Specifications
34th Avenue Intersection Improvements
Area
1st. St. SW and 43rd Ave.Intersections
Project Number
1232
Bid Number
2016002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blue <br />Goose <br />Construction <br />Heavy Civil / Underground Utilities / Complete Site Development 1 Marine <br />State Certified Licensed <br />General Contractor #CGC1517686 <br />Pollutant System Contractor # PCC056727 <br />Underground Utility & Excavation # CUC1225110 <br />Project Reference Sheet <br />Project: Access Point 1 <br />Owner / Contact: St. Johns River Management District, Ralph Brown (321)863-0063, <br />rbrown@sjrwmd.com <br />Contract Amount: $1,300,000.00 <br />Date Completion: August 2015 <br />Description: Constructed as the main public access point for the Fellsmere Water Management <br />Area, the Fellsmere Waterway Crossing / Access Point One Public Access location was <br />constructed across the main Fellsmere water Conveyance Canal by providing twin 400 linear <br />foot long 72" diameter CAP drainage pipes with associated water control gates. These twin 72" <br />drainage pipes were installed with associated mechanically operated gates by imbedding the <br />basin pipes in structural high pressure concrete to prevent water piping through the structural <br />embankment. Drainage pipes and control gates were anchored additionally with helical anchor <br />ground penetrating devices and cabling to prevent buoyant forces from floating the pipe <br />sections. <br />Drainage piping section were capped with embanked structural fill and rip rap wave dispersion <br />systems to prevent erosion along the drainage corridor. The Project was completed with staff <br />monitoring devices that provide water control depth measurements during water management <br />activities. This project contained a huge amount of dewatering due to an existing canal <br />condition, drainage pipes being installed in an existing flow way while maintaining drainage as <br />well as Targe amounts of rainfall during the project completion. <br />P 0 Box 14709 * Ft Pierce, FL 34979-4709 * Ph. (772) 461-3020 * Fal. (772) 468-4669 <br />
The URL can be used to link to this page
Your browser does not support the video tag.