My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-242B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-242B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 10:24:39 AM
Creation date
1/19/2016 11:02:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/15/2015
Control Number
2015-242B
Agenda Item Number
8.M.
Entity Name
Blue Goose Construction
Subject
Contract Documents & Specifications
34th Avenue Intersection Improvements
Area
1st. St. SW and 43rd Ave.Intersections
Project Number
1232
Bid Number
2016002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blue <br />Goose <br />Construction <br />Heavy Civil / Underground Utilities / Complete Site Development / Marine <br />State Certified Licensed <br />General Contractor #CGC1517686 <br />Pollutant System Contractor # PCC056727 <br />Underground Utility & Excavation # CUC1225110 <br />Project Reference Sheet <br />Project: Fellsmere Water Management Area <br />Owner / Contact: St. John's River Water Management District Ralph Brown (386)329-4469 <br />rbrown@sjrwmd.com <br />Contract Amount: $11,500,000.00 <br />Date Completion: WO 1-12 Completed 10/2011 <br />Relevancy: Clearing, Grubbing , Soil Stripping, Heavy General Excavation / Core Levee <br />Construction, Soil Excavation Embankment and Compaction, Demolition of Farm Structures / <br />Pump Stations, Installation of Control Structures / Water Control Flashboard Risers, Haul Road <br />Construction / Maintenance, Seeding and Sodding, Monitoring Well Construction, Monitoring <br />Instrumentation. <br />Construction Description: <br />Construction of 8 mile earthen levee around a total accumulated 10,000 acre water <br />management area. Clearing trees, grubbing roots, stripping topsoil, prepare levee footprint, <br />removing muck and coarse soils. Demolition of existing farm support structures and existing <br />pump station structures. Remediation of petroleum contaminated soils associated with <br />petroleum storage tank locations. Provided for Phase 1 and Phase 2 Remedial Action plans <br />resulting in clean up and disposal of petroleum contaminated soils. Mixing high fines content <br />soil (split layers) with sand to develop material for levee construction. Loading and hauling fill <br />material, placing, spreading 12" loose lifts, disking (mix) and compacting material to <br />specifications. Installation of sand filters drainage system into levee (toe drain). Final <br />restoration of hauled, graded and embanked soils with Sod, Seed and Mulch including <br />Hydroseed. Subcontract the installation of boundary monitoring wells and monitoring <br />instrumentation associated with groundwater strata essential patterning of groundwater <br />tables. <br />P 0 Box 14709 * Ft Pierce, FL 34979-4709 * Ph. (772) 461-3020 * Far: (772) 468-4669 <br />
The URL can be used to link to this page
Your browser does not support the video tag.