My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
01/22/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:01:18 PM
Creation date
1/19/2016 1:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee Update Study Workshop
Tindale-Oliver & Associates, Inc.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Indian River County I Impact Fee Update Study <br />Cost Component <br />The cost of providing roadway system capacity has decreased in recent years. Construction <br />costs increased significantly in Florida between 2005 and 2007 due to additional <br />construction demand caused by hurricanes, the housing market growth, and other factors. <br />Appreciation in land values also resulted in higher right-of-way (ROW) costs during the same <br />period. In early 2008, costs started to stabilize, and in recent years, communities have <br />experienced a decrease in construction costs, returning to'levels seen before 2005. Cost <br />information from Indian River County, other Florida Counties, and the Florida Department <br />of Transportation (FDOT) was reviewed to develop a'unifcost for all phases involved in the <br />construction of one lane -mile of roadway capacity. • The following subsections summarize <br />the methodology and findings of the total,,unit.,cost analysis fdrrcounty and state roads. <br />Appendix C provides the data and other support information utilizedin:these analyses. <br />County Roadway Costs <br />This section examines the right-of-way'(ROW),. construction, and other cost components <br />associated with county,_roads with respect to ..transportation, -capacity improvements in <br />Indian River County.For this purpose, recent bididata for ongoing projects provided by the <br />County and recent::construction bid data from county roadway projects throughout Florida <br />were used to identify and provide ,supporting cost data for county improvements. The cost <br />for each --roadway capacity 'project ,:,was separated into four phases: design, <br />construction engineering inspection (CEI), ROW_and construction. <br />Design and CEI <br />Design costs4forcounty roads Were estimated at 10 percent construction phase costs based <br />on a review of'.cost-data collected for recent transportation impact fee studies throughout <br />Florida. Additional`detail is.proyided in Appendix C, Table C-10. <br />.S <br />CEI costs for county roads were estimated at 9 percent of construction phase costs based on <br />a review of cost data collected for recent transportation impact fee studies throughout <br />Florida. Additional detail is provided in Appendix C, Table C-16. <br />Right-of-Wav <br />The ROW cost reflects the total cost of the acquisitions along a corridor that were necessary <br />to have sufficient cross-section width to widen an existing road or, in the case of new <br />Tindale -Oliver & Associates, Inc. Indian River County <br />January 2014 106 Impact Fee Update Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.