My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
01/22/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:01:18 PM
Creation date
1/19/2016 1:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee Update Study Workshop
Tindale-Oliver & Associates, Inc.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Indian River County 1 Impact Fee Update Study <br />To calculate the interstate and toll (I/T) facility discount factor, the loaded highway network <br />file was generated for the Greater Treasure Coast Regional Planning Model v3.4 <br />(GTCRPM). A select Zink analysis was run for all traffic analysis zones located within Indian <br />River County in order to differentiate trips with an origin and/or destination within the <br />county versus trips with no origin or destination within the county. <br />Currently, the only interstate/toll facilities in Indian River County are 1-95 and the Florida <br />Turnpike (SR 19). The limited access vehicle miles of travel'(Limited Access VMT) for trips <br />with an origin and/or destination within Indian River ?County was calculated for the <br />identified limited access facilities. The total Indian River;County VMT was calculated for all <br />r <br />trips with an origin and/or destination within Indiari-River County for all roads, including <br />limited access roads, located within Indian River County. <br />The I/T discount factor of 17.3 percent was dete`rmined by.dividing the'1total Limited Access <br />VMT by the total Indian River County VMT. By applying`this7factor to the total Indian River <br />County VMT for each land use in`the fee schedule, the reduced VMT is then representative <br />of only the roadways which are funded'•bOmpact fees. -Appendix B, Table B-1 provides <br />further detail on this calculation. <br />Tindale -Oliver & Associates, Inc. <br />Indian River County <br />January 2014 105 Impact Fee Update Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.