Laserfiche WebLink
MAR 2 6 1966 BOOK 63 <br />with the 8th Street connection, and phase the construction so <br />that the Boulevard and the 8th Street connection is built first. <br />Once that is open, we could do the heavy construction in the 12th <br />Street corridor and divert traffic to 8th and 16th Streets. . - <br />Administrator Wright advised that the Board has already <br />given authorization to go to bid, but Director Davis stated that <br />this was just for the Board's information. <br />SANDRIDGE GOLF CLUB - CONSTRUCTION CONTRACT <br />Attorney Vitunac explained that the Board actually approved <br />this contract several weeks ago, but there are several changes <br />and staff feels that the Chairman should sign the contract as it <br />now stands. <br />Administrator Wright reviewed the following changes to the <br />standard AIA contract with Guettler 8 Sons, Inc. for the <br />construction of the new County golf course at Kiwanis-Hobart <br />Park: <br />Schedule of Values <br />Under Item (C) with respect to earthwork, it notes that lakes <br />will be dug as per plan, subject to a minimum 6 to 1 slope, top <br />of bank to lake bottom with a lake bottom elevation of 11. <br />Administrator Wright felt that we need a clear understanding with <br />the Architect as to how much earth is going to be removed under <br />the lump sum contract. He did not feel there would be a problem, <br />but we have to clarify the matter before the Chairman actually <br />signs the contract. <br />Amendment to Proposal, dated 3-7-86 <br />II. IRRIGATION <br />Add: "to include the installation of the irrigation <br />system." <br />V. OPTIONAL TERMS <br />B. Administrator Wright felt we need to specify the <br />retainage amount at being 15% per category. <br />54 <br />