My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/2/1986
CBCC
>
Meetings
>
1980's
>
1986
>
4/2/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:01 AM
Creation date
6/12/2015 12:36:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/02/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Gifford Road. The Utilities Division is therefore proposing that a 16 <br />inch water main be installed in accordance with the Master Plan to enhance <br />the fire protection capabilities throughout the South Gifford Area. <br />In cases where the oversizing of lines is required to conform to the water <br />system Master Plan, the Utility Division participates by sharing the cost <br />of the oversized line. In this case, the Utilities Division contribution <br />in funding the replacement of.the subject water main would be one half of the <br />cost, since the proposed 16 inch line is twice as large as the 8 inch line <br />required to serve the County's new jail complex. Furthermore, the Utilities <br />Division proposes the remainder of the costs of the project be funded by the <br />General Services Division/Jail Project since the County's new jail complex <br />will directly benefit from the improvements. <br />The Utilities Division has received a proposal for engineering services from <br />Masteller & Moler Associates, Inc., in the amount of $8,650.00 and a budget <br />estimate for construction in the amount of $102,050.00 for the 3350 linear <br />feet of piping, necessary valves- and appurtenances, making the total project <br />cost $110,700.00. Applying the above outlined funding methodology, the <br />Utilities Division would be responsible for 50 percent of the total <br />construction cost or $55,350.00, the remaining 50 percent being the <br />responsibility of the General Services-Division/Jail Project. _ <br />RECOMMENDATION <br />Staff recommends that the Board of County Commissioners authorize the subject <br />water distribution improvements and approve the. above outlined funding for the <br />project. <br />Director Pinto noted that since the line is going to <br />facilitate the needs of the Jail specifically, we are proposing <br />that part of the funds are to be paid by the Jail and part paid <br />from utility impact fees. <br />Administrator Wright pointed out that this will save us from <br />having to install a booster pump. <br />Commissioner Lyons asked if there will be additional <br />fireplugs, and Director Pinto confirmed there will be a hydrant <br />every 1,000' and that is included in the cost. This will loop <br />into the existing system and increase the fire flow throughout <br />the community. He noted that staff needs approval to proceed <br />with the'engineers and go out to bid. <br />ON MOTION by Commissioner Lyons, SECONDED by Commis- <br />sioner Bowman, the Board unanimously authorized the <br />water distribution improvements described in the above <br />memo, approved the outlined funding, and approved Work <br />Authorization No. 5 for Consulting Services with Sippel, <br />Masteller, Lorenz & Hoover, Inc. <br />59 <br />APR 2 1996 BOOK 64 PAGE 5.9 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.