Laserfiche WebLink
end up putting a dual line there, and it is a matter of <br />determining the area of service to see where we cut that line. <br />The City has their consultant to look at their side, and we have <br />to have our consultant to look at our side; so each should bear <br />the cost of their own consultant. <br />Chairman Scurlock noted there are three elements in this: <br />the engineering portion of what you physically can do - the <br />economic impact of specific service areas and cash flow - and the <br />third element of just rendering efficient service to everyone. <br />Director Pinto explained the reason that we use Boyle <br />Engineering is because our computer program for hydraulics is in <br />the Boyle master plan program. <br />ON MOTION by Commissioner Lyons, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />the contract for additional engineering services with <br />Boyle Engineering for refining City/County utility <br />service area boundaries, with a limit of $5,000 and <br />authorized the Chairman's signature. <br />41 <br />P 9 19 6 Bou 64 ray x.13 <br />