My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/9/1986
CBCC
>
Meetings
>
1980's
>
1986
>
4/9/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:01 AM
Creation date
6/12/2015 12:18:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/09/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
end up putting a dual line there, and it is a matter of <br />determining the area of service to see where we cut that line. <br />The City has their consultant to look at their side, and we have <br />to have our consultant to look at our side; so each should bear <br />the cost of their own consultant. <br />Chairman Scurlock noted there are three elements in this: <br />the engineering portion of what you physically can do - the <br />economic impact of specific service areas and cash flow - and the <br />third element of just rendering efficient service to everyone. <br />Director Pinto explained the reason that we use Boyle <br />Engineering is because our computer program for hydraulics is in <br />the Boyle master plan program. <br />ON MOTION by Commissioner Lyons, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />the contract for additional engineering services with <br />Boyle Engineering for refining City/County utility <br />service area boundaries, with a limit of $5,000 and <br />authorized the Chairman's signature. <br />41 <br />P 9 19 6 Bou 64 ray x.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.