Laserfiche WebLink
13th Street S.W. Bridge at 58th Avenue <br />Change Order No. 1 <br />SCHEDULE OF ITEMS TO BE ADDED AND DELETED <br />IRC Project No. 0530B <br />FINAL Change Order <br />Oct 20, 2015 <br />Item No. <br />Description of Change Unit <br />Quantity <br />Unit Price Price Increase Price Decrease <br />Decrease <br />334-1-113 <br />Super Pave Asphaltic Concrete (Traffic C) (SP -9.5) (11 <br />SY <br />379 <br />7.65 <br />2,899.35 <br />570-1-2A <br />Performance Turf - Sod (Floritam) <br />SY <br />102 <br />2.95 <br />300.90 <br />455-34-3 <br />18" Square X 45' Minimum <br />LF <br />180 <br />76.00 <br />13,680.00 <br />706-3 <br />RPM Bi -Directional Amber/Amber <br />EA <br />48 <br />4.90 <br />235.20 <br />706-3-1 <br />RPM Mono Direct White/Clear <br />EA <br />2 <br />4.90 <br />9.80 <br />711-11-221 <br />Thermo Solid TS 6" Double Yellow <br />LF <br />24.00 <br />2.30 <br />55.20 <br />Increase <br />285-706A <br />8" Compacted Asphalt Millings (2 rifts) <br />SY <br />334 <br />7.00 <br />2,338.00 <br />334-1-13A <br />Super Pave Asphaltic Concrete (Traffic C)ISP-12.5) (1.5") <br />SY <br />134 <br />9.20 <br />1,232.80 <br />522-2 <br />Concrete Sidewalk 6" Thick <br />SY <br />7 <br />40.00 <br />280.00 <br />530-3-4 <br />Rock -Rubble Rip Rap <br />TN <br />240 <br />46.00 <br />11040.00 <br />570-1-2A <br />Performance Turf - Sod (Bahia) <br />SY <br />1,420 <br />1.65 <br />2,343.00 <br />711-11-121 <br />Thermo Solid TS 6" White <br />LF <br />76 <br />1.15 <br />87.40 <br />711-11-125 <br />Thermo Solid TS 24" White <br />LF <br />1 <br />4.35 <br />4.35 <br />711-11-224 <br />Thermo Solid TS 18" Yellow <br />LF <br />13 <br />3.15 <br />40.95 <br />1050-112-12 <br />4" PVC Conduit <br />LF <br />228 <br />18.00 <br />4 104.00 <br />Work Change Directives - Additional Cost <br />^ <br />WCD#2 <br />Additional Cost <br />LS <br />1 <br />4,261.28 <br />4,261.28 <br />WCD#3 <br />Additional Cost <br />LS <br />1 <br />33,421.33 <br />33,421.33 <br />WCD#6 <br />Additional Cost <br />LS <br />1 <br />523.09 <br />523.09 <br />FORCE ACCOUNT <br />75,000.00 <br />Subtotals <br />59,676.20 <br />92,180.45 <br />TOTAL CHANGE ORDER #1 <br />($32,504.25) <br />FlPudic Wortu ENGINEERING DIVISION PROJECTS \053013 13th Street SW at 58th Ave Bridge'Adminlagenda items\Change Order Form No 1 13th Street S.W. at 58th Avenue Bridge Page 1 <br />