My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
10/20/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 10:04:53 AM
Creation date
2/2/2016 11:42:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/20/2015
Meeting Body
Environmental Control Board
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 1 <br />DATE OF ISSUANCE: 10/21/2014 <br />EFFECTIVE DATE: 10/21/2014 <br />OWNER: Indian River County <br />CONTRACTOR: Dickerson Florida, Inc. <br />Bid No: 2014046 <br />Project: 13th Street S.W. at 58th Avenue Bridge <br />OWNER's Contract No. 2014046 <br />ENGINEER: Indian River County <br />ENGINEER's Contract No. 0530-B <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Delete a small portion of guardrail and end anchorage assembly northeast of the proposed bridge near <br />Station 51+50 as shown of the plans, Sheets 9 & 10 revised 8/6/14. <br />Suspend contract time during the utility relocations of the°Shoe Fly' after the Contractor completes <br />Gearing for FPL and ATT. The estimated suspension time is 15 to 30 days. <br />Purpose of Work Change Directive: <br />Delete the guardrail system northeast of the access driveway at Station 51+50 on the north side of 13th <br />Street SW for better access. <br />Suspend contract time to allow FPL and ATT to complete the utility relocations of the "Shoe Fly" after the <br />contractor completes clearing in the area of the bridge. <br />Attachments: <br />Plan Sheets 9 & 10 Revised 8/6/14 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices: Contract Times <br />X Unit Prices <br />II Lump Sum <br />Q Other. <br />II By Change Order. <br />Estimated increase in Contract Price: <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Q Contractor's Records <br />Q Engineer's Records <br />X Other. Deletion of unit price, Suspension of <br />contract time <br />Q By Change Order. <br />Substantial Completion: 150 days; <br />Ready for Final Completion: 180 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACC "' -- <br />By: / <br />CONT' • CTOR (Signature) <br />Date: (6I%1 [ t <br />RECOMMENDED: <br />ENGINEER (Signature) <br />Date: / D/2 /// <br />-O r . - ( e) ,/- <br />Da - . /. -,2 /- i <br />F:\Public Wores\F2dGINEERING DIVISION PROJECTS10530B 13th Street SW at 58th Ave Bridge\Artmin\Work Change Directives\0530B - Work Change Directive <br />#1.doc <br />62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.