My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
11/17/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:47:34 AM
Creation date
2/2/2016 1:24:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/17/2015
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR for all things done or furnished in connection with the work <br />under this Contract and for ievery act and neglect of the OWNER and others <br />relating to or arising out of the work. Any payment, however, final or otherwise, <br />shall not release the CONTRACTOR or its sureties from any obligations under <br />the Contract Documents or the Public Construction Bond. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this AgreementCONTRACTOR makes the <br />following representations' <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents: <br />B. CONTRACTOR has visited the Site aridbecome familia with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with <br />to all federal, state, and local Laws and <br />Regulations that may affect cost, ;wog ress and` performance of the Work. <br />D. CONTRACTOR hascarefully studied all (1) reports of explorations and tests of <br />subsurface conditions "at or_contiguou to the Site and all drawings of physical conditions <br />in or relating to existing surface or subsurfacestructures at or contiguous to the Site <br />(except Underground Facilities) 'ic, have been identified in the Supplementary <br />Conditions as";provided in paragraph 4. <45f the General Conditions and (2) reports and <br />drawings of azardous Environmental Condition, if any, at the Site which have been <br />identified in t e: Supplementary Conditions as provided in paragraph 4.06 of the General <br />E. -:CONTRACTOR has obtained and carefully. studied (or assumes responsibility for having <br />done so) aall additionaor supplementary examinations, investigations, explorations, tests, <br />studies, and -data concerning conditions (surface, subsurface, and Underground Facilities) <br />at or contiguous to the Site which may affect cost, progress, or performance of the Work <br />or which relate .to any aspect of the means, methods, techniques, sequences, and <br />procedures .of construction ;to be employed by CONTRACTOR, including applying the <br />specific means, methods, techniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to -be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents <br />00520 - Agreement (Public Works) SAMPLE 39 <br />00520 - 5 <br />F'Public Works\ENGINEERING DIVISION PROJECTS11304-CR 512 Resurf (SCOP)_125th Ave to I-951Admim\agenda items\00520 - Agreement (Public Works) SAMPLE.doc <br />I (� <br />
The URL can be used to link to this page
Your browser does not support the video tag.