My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/01/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
12/01/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:43:41 AM
Creation date
2/2/2016 1:46:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/01/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$Ufl$HIflf <br />LAND DESIGN <br />3291 SE Lionel Terrace, Stuart, FL 34997 <br />Phone: 772 283 2648 / Fax: 772 283 8944 <br />www.SunshineLandDesign.com <br />PROPOSAL <br />TO: Arjuna Weragoda PROPOSAL DATE: 11/14/2015 <br />Indian River County Utilities <br />Mobile: (772) 226-1821 SUBMITTED BY: TIM TAYLOR <br />E-mail: aweragoda@ircgov.com ttavlor&..sunshinelanddesign.com <br />]OB DESCRIPTION: <br />ENGINEER: <br />PLAN DATE: <br />IRC 45th Street <br />AC Water Main Replacement <br />,7OB AS OUTLINED BELOW <br />QTY UNITS ITEM $ XTEM COST <br />1 MOBILIZATION / CONSTRUCTION BOND COST 1 LS $ 19,800.00 $ 19,800.00 <br />2 MAINTENANCE OF TRAFFIC (SHOULDER/ SIDEWALK CLOSURES) 1 LS $ 11,550.00 $ 11,550.00 <br />3 SIDEWALK REMOVAL AND REPLACEMENT 3,720 SF $ 6.60 $ 24;552.00 <br />4 SOFT DIG (POT HOLE / LOCATE / VACUUM TRUCK) 1 LS $ 6,600.00 $ 6,600.00 <br />5 INSTALL ATION OF : MAIN UNE / VALVES / CONNECTIONS / SEVICES / ETC <br />a) MATERIALS INCLUDING A 10% CONTINGENCY 1 LS $ 51,417.19 $ 51,417.19 <br />b) MATERIAL SALES TAX 1 LS $ 3,085.03 $ 3,085.03 <br />b) LABOR AND EQUIPMENT COSTS 1 LS $ 49,500.00 $ 49,500.00 <br />6 DIRECTIONAL BORE 977 LF $ 33.00 $ 32,241.00 <br />7 OPEN ROAD CUTS AND REPAIRS (SIDE STREET CONNECTIONS) 5 EA $ 3,850.00 $ 19,250.00 <br />8 TESTING / BACTEES / ACCEPTANCE 1 LS $ 11,110.00 $ 11,110.00 <br />9 ABANDON/ GROUT EXISTING LINES AND VALVES 1 LS $ 19,618.70 $ 19,618.70 <br />10 SURVEY/ DATA COLLECTION/ RECORD DRAWINGS 1 LS $ 8,250.00 $ 8,250.00 <br />11 AC LINE STOP (IF REQUIRED) 2 EA $ 4,664.00 $ 9,328.00 <br />45 DAY EXTENSION <br />PER CONTRACT <br />ITOTAL: $ 266,301.92) <br />ATTACHMENT NO. 2 <br />CGC1518885/CUC1223792 Watermain relocation 11/15/2015 91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.