My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/19/2016
CBCC
>
Meetings
>
2010's
>
2016
>
01/19/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:50:47 AM
Creation date
2/3/2016 9:46:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/19/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942 - Change Order Form <br />DATE OF ISSUANCE: 1/19/2016 <br />No. 03 <br />EFFECTIVE DATE: 1/19/2016 <br />OWNER: Indian River County <br />CONTRACTOR KAST Construction Company LLC. <br />Project: INTERGENERATIONAL RECREATION FACILITY AT SOUTH COUNTY PARK <br />OWNER'S Project No. 1135 <br />OWNER'S Bid No. 2014052 <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Install 195 data connections in the predetermined locations shown on the conformed <br />documents for the building. Provide all equipment and installation services specified in the <br />attached documents. <br />Reason for Change Order: <br />The original design did not include material and installation of data connections for the <br />project. <br />Attachments: (List documents supporting change) <br />KAST Request for Change Order No. 25R.01 dated October 27, 2015 <br />CHANGE IN CONTRACT PRICE: <br />Description <br />Amount <br />Original Contract Price <br />$10.676.278.03 <br />Net Increase from previous <br />$192.800.56 <br />Change Order Nos. 1 and 2: <br />360 <br />Contract Price prior to this Change <br />$10.869.078.59 <br />Order: <br />(days) <br />Net increase of this Change Order- <br />$76.292.75 <br />Contract Price with all approved <br />$10.945.371.34 <br />Change Orders: <br />ACCE <br />CONTRACTOR (Signa re) <br />Date: G?f� y/2 16 <br />CHANGE IN CONTRACT TIMES <br />Description <br />Time <br />Original Contract Time: <br />(days) <br />Substantial Completion: <br />330 <br />Final Completion: <br />360 <br />Net change from previous Change <br />Orders Nos. 1 and 2: <br />(days) <br />Substantial Completion- <br />15 <br />Final Completion: <br />15 <br />Contract Time prior to this Change <br />Order: <br />(days or dates) <br />Substantial Completion: <br />345 <br />Final Completion: <br />375 <br />Net change for this Change Order: <br />(days or dates) <br />Substantial Completion: <br />0 <br />Final Completion: <br />0 <br />Contract Time with all approved <br />Change Orders: <br />(days or dates) <br />Substantial Completion: <br />345 <br />Final Completion: 1 <br />375 <br />RECOMMENDED: <br />By: <br />ENGINEER (Signature) <br />Date: l Z / 3 / t// <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />00942 - Change Order No. 3 123115 <br />00942-1 150 <br />FAPubliic Works�ENGINEERING DIVISION PROJECTS11135-S County Park Intergeneratiional Rec FacilitylAdmimXagenda items\Change Order #3100942 - Change Order No. <br />3 123115.doc Rev. 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.