My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/19/2016
CBCC
>
Meetings
>
2010's
>
2016
>
01/19/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:50:47 AM
Creation date
2/3/2016 9:46:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/19/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3ma <br />KAST CONSTRUCTION COMPANY, LLC <br />701 NORTHPOINT PARKWAY, SUITE 400 <br />WEST PALM BEACH, FL 33407 <br />Request for Change Order No. 25R.01 <br />Date: 10/27/2015 <br />Project: 14-014-01 IRC INTERGENERATIONAL REC CENT <br />1590 9TH STREET SW <br />VERO BEACH. FI. 32962 <br />To: Dan ,rrbovich <br />BORRELLI + PARTNERS <br />720 VASSAR STREET <br />ORLANDO, FL 32804 <br />Description: Data /Communications 76.292.75 <br />You are directed to make the following changes in this Contract: <br />Provide and install 195 data drops. <br />Includes 3, 4 post racks w/ladder tray. <br />2 wall mounted racks <br />From: KAST CONSTRUCTION COMPANY, LLC. <br />701 NORTHPOINT PARKWAY <br />SUITE 400 <br />WEST PALM BEACH, FL 33407 <br />See Complete Electric Quote dated 11/04/2015 and supporting quote front Complete Alarm Inc. attached <br />The above-mentioned changes are established from attached documentation (Exhibit A). <br />The total direct cost to perform this work is............................................................................................... <br />(Please refer to attached sheet for details.) <br />$70.348.96 <br />SDI <br />$70,348.96 <br />1.35% <br />$949,71 <br />Insurance <br />$71,298.67 <br />0.90% <br />$641.69 <br />Bond <br />$71,940.36 <br />100% <br />$719.40 <br />1:ec; <br />$72,659.76 <br />5.00010 <br />$3,632.99 <br />The schedule will be Yes. <br />Response Due: <br />Total: $76,292.75 <br />Page I of 3 151 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.