My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
12/15/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:21:20 AM
Creation date
2/4/2016 11:27:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/15/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Original Cost Estimate/ Grant Request <br />Archie°Smith Fish':House-Phase IIA:Dock Restotitions:FIND.:Waterways.Assistance_ProgramProject.,., <br />. - , ...roject Elements _ - : '_ >' <br />- Estimated. Cost-' <br />" >rFIND Cost ; <br />' ..1" 9.4nty,Cost; <br />Reconstruct main dock, add floating dock <br />kayak landing, and construct 4 boat slips <br />(2,421 sq. ft.) <br />$450,500 <br />$225,250 <br />$225,250 <br />Historic site architectural oversight <br />$32,700 <br />$16,350 <br />$16,350 <br />TOTAL <br />$483,200 <br />$241,600 <br />$241,600 <br />Revised Scope/Cost Estimate Based on Reduced Grant Award <br />..Archi;S'mith-:Fist .Hous05.h'aselltk ock_RestoratiOi Eil . .ii e6*s.Ass stance;Pcogram:_PrWe' ;:: <br />= : ''Project Elements ,1 '__:1:4E-Estiinated=Cost <br />Y-,:2,FI - z:. iiii--, <br /><':: :Count Cost <br />Reconstruct main dock and construct 4 boat <br />slips (2,421 sq. ft.) <br />$181,800 <br />$90,900 <br />$90,900 <br />Historic site architectural oversight <br />$18,200 <br />$9,100 <br />$9,100 <br />TOTAL <br />$200,000 <br />$100,000 <br />$100,000 <br />For the Board's approval, attached to this report is the formal FIND Project Agreement for the (revised) <br />grant award (Attachment 4 to this report). <br />ANALYSIS <br />The overall dock restoration, as designed by the project architect, entails reconstruction of the existing dock, <br />adding a floating dock and kayak landing, and constructing four boat slips at the terminus of the dock. <br />Based on the reduced amount of available FIND funding under the current grant cycle, the scope of this <br />"first phase" of restoration has been revised so as not to include the planned addition of a floating dock and <br />kayak landing. Notwithstanding, the revised scope will allow progress towards overall restoration of the <br />historic Archie Smith Fish House site, which is planned to be funded incrementally over time with this <br />grant and with future grants. <br />FIND Project Agreement <br />The FIND Project Agreement is a two-year grant that requires project completion by September 30, 2017, <br />with an opportunity for a one-year extension subject to FIND approval. As currently written, the FIND <br />grant is for 50% of the (revised) phase project costs, not to exceed $100,000. <br />Funding <br />Since the original proposed project would have resulted in boating improvements, the County's Florida <br />Boating Improvement Fund was identified as the County's appropriate funding source for the original <br />project. The Boating Improvement Fund is still the appropriate funding source for the (revised) estimated <br />$100,000 cost -share match, since the revised project will also result in boating improvements. <br />RECOMMENDATION <br />Staff recommends that the Board of County Commissioners approve the attached FIND grant Project <br />Agreement based on the revised scope of work and authorize the Board Chairman to sign the Agreement <br />on behalf of the Board. <br />2 <br />M:\LAAC\Archie Smith Fish House\Archie Smith 2015 FIND grant app\ASFH FIND Grant Agree BCC staff rpt for 12-15-15.docx <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.