My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
12/15/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:21:20 AM
Creation date
2/4/2016 11:27:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/15/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/4/2015 <br />ESTIMATED LUMP SUM FEE TABULATION <br />INDIAN RIVER COUNTY <br />GRAVITY SEWER PROJECT FOR NORTH COUNTY - PHASE 2 <br />ENGINEERING DESIGN/PREPARATION OF CONSTRUCTION PLANS &'PERMITTING APPLICATIONS <br />File 1422/Phase 2 <br />Sched_manhours.xls <br />(Design_Services) <br />Engineering Design/Permitting <br />Surveying Services <br />Soils Engineering Services <br />Reimbursable Expenses <br />Total <br />$ 169,125.00 <br />$ 32,900 00 <br />$ 4,370.00 <br />$ 1,500 00 <br />$ 207,895 00 <br />Principal / PE <br />Project Manager <br />Designer (CAD) <br />Support Staff <br />Total Costs <br />Comments <br />$ 175.00 <br />$ 110.00 <br />$ 90.00 <br />$ 60.00 <br />Hours <br />Amount <br />Hours <br />Amount <br />Hours <br />Amount <br />Hours <br />Amount <br />Engineering Design <br />116 <br />$ 20,300.00 <br />167 <br />$ 18,370 00 <br />103 <br />$ 9,270.00 <br />103 <br />$ 6,180 00 <br />$ 54,120.00 <br />Preparation of <br />Construction Plans <br />105 <br />$ 18,375.00 <br />186 <br />$ 20,460.00 <br />664 <br />$ 59,760.00 <br />48 <br />$ 2,880 0,0 <br />$ 101,475.00 <br />Preparation of Reports & <br />Permit Applications <br />36 <br />$ 6,300 00 <br />30 <br />$ 3,300.00 <br />19 <br />$ 1,710.00 <br />37 <br />$ 2,220.00 <br />$ 13,530.00 <br />Permits needed from FDEP, <br />FDOT, and County Right-of-way <br />Access <br />Total (hrs/cost) <br />257 <br />$ 44,975.00 <br />383 <br />$ 42,130.00 <br />786 <br />$ 70,740.00 <br />188 <br />$ 11,280.00 <br />$ 169,125.00 <br />File 1422/Phase 2 <br />Sched_manhours.xls <br />(Design_Services) <br />Engineering Design/Permitting <br />Surveying Services <br />Soils Engineering Services <br />Reimbursable Expenses <br />Total <br />$ 169,125.00 <br />$ 32,900 00 <br />$ 4,370.00 <br />$ 1,500 00 <br />$ 207,895 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.