Laserfiche WebLink
System <br />End Point <br />Data Collector <br />Collector Range <br />Head End <br />MDM <br />Network Type <br />Meter Compatibility <br />AMR to AMI Option <br />Other <br />Operating Models <br />Choice Connect 100 <br />ERT 100W <br />Cell Control Unit <br />Up to 1 mile <br />AMI Software Suite <br />Itron Analytics (formerly IEE) <br />STAR <br />All IRCDUS meters with register change out to ERT 100W, uses Badger <br />Yes, Itron supports AMR deployment with subsequent switch to AMI <br />Leak Detection, Customer Self Service, mobile for tablets and phones <br />Utility owned, vendor support for infrastructure and/or systems <br />Proven AMI/AMR vendor for water market <br />Meter Agnostic <br />Proven installation and management services <br />Has pumped a lot of R&D into their solution <br />Fixed RF in a number of medium sized utilities <br />Offers AMR to AMI seamless switch <br />Typically amongst the more expensive solutions <br />© Langham Consulting Services Inc. 1 Indian River County Department of Utilities 1 January 16, 20151 www.langhamconsulting.net <br />GMAM <br />(.4.1.41.111/.111 KV <br />