My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
12/15/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:21:20 AM
Creation date
2/4/2016 11:27:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/15/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />CONSENT <br />gK <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />Richard B. Szpyrka, P.E., Assistant Public Works Director <br />FROM: Michael D. Nixon, P.E., Roadway Production Manager 474/ <br />SUBJECT: Award of Bid No: 2016001 <br />OId Dixie Highway Resurfacing (71St Street to County Road 510) <br />IRC Project No. 1138 <br />DATE: November 20, 2015 <br />DESCRIPTION AND CONDITIONS <br />The proposed improvements to OId Dixie Highway consist of refurbishing (full depth <br />reclamation) of the roadway base from 71st Street to County Road 510, with the addition of 4 - <br />foot wide paved shoulders, including new asphalt surface and structural courses, pavement <br />markings and drainage improvements. This is a Florida Department of Transportation (F.D.O.T.) <br />Small County Outreach Program (SCOP) funded project, FM No. 429567-1-58-0. The SCOP <br />Grant will provide up to 75% reimbursement of the eligible construction cost up to a maximum <br />amount of $1,438,747.00, including construction engineering inspection (CEI) services. The <br />County will fund the remaining construction cost which includes utility relocation cost. <br />The bid opening was held on October 21, 2015. Four (4) bids were received and opened. A <br />detailed bid tabulation is on file and available for viewing in the County Engineering Division. <br />Bid totals are as follows: <br />Timothy Rose Contracting, Inc. <br />Ranger Construction Industries, Inc. <br />Community Asphalt Corporation <br />Engecon Construction, Inc. <br />Vero Beach, Florida <br />Ft. Pierce, Florida <br />Vero Beach, Florida <br />Lake Worth, Florida <br />* Denotes mathematical errors were found and bid amount corrected. <br />$ 2,467,160.62 <br />$2,747,514.35 * <br />$2,903,955.58 <br />$3,043,056.62 <br />Timothy Rose Contracting, Inc. is considered to be the lowest, responsive, responsible bidder <br />for the project with a bid totaling $2,467,160.62. Timothy Rose Contracting, Inc., has <br />completed various construction projects for the County and has consistently performed work in <br />a satisfactory manner. Timothy Rose Contracting, Inc. bid of $2,467,160.62 was below the <br />Engineer's estimate of $2,733,429.00 <br />C:\Usen4szpyrka\Desktop\BCC Agenda Award of Bid I2 -I 5-I5.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.