Consultant will prepare supporting documents,consisting of drawings,specifications,projections; <br /> and calculations supporting the pen-nit application. <br /> Consultant will prepare four(4) signed and sealed copies of permit application package and <br /> submit to FDEP Southeast District. <br /> Consultant will respond to one round of reasonable requests for additional information from <br /> FDEP permitting agency requests for clarification. <br /> Task 3—Observations and Startup <br /> Consultant will review additional submittals on membrane elements for stage 2 of RO skids#5 <br /> and#8,permeate piping replacement, and respond to OEM and 1RCU staff questions. <br /> Consultant will review performance of RO train#1 and #2 membranes and provide a suggested <br /> membrane loading scheme of used membrane elements into RO skid#7. Consultant will provide <br /> coordination with OEM on the loading of these elements. <br /> Consultant will provide an additional four(4)days of on-site observations of membrane <br /> installation in an effort to track and monitor loading of the membrane elements for RO trains#5, <br /> #8,and V. <br /> Consultant will provide up to four(4)days of startup observations, consisting of review of profile <br /> data,membrane system performance,water quality test results,and operational testing of RO skid <br /> #7 components. <br /> Consultant will attend and witness startup acid operational testing of RO skids#5,#8,and 47. RO <br /> skids#5 and#8 will only consist of operational testing with stage 2 membrane elements and <br /> review of water quality testing performed by OEM. Operational testing of RO skid#7 will <br /> consist of review and coordination with SCADA programmer the loop scaling and operation, <br /> instrument ranges,and tuning of pre-treatment,steady-state, and post-flushing of the RO skid. <br /> Consultant will develop a punch-list of incomplete items based on our on-site observations and <br /> startup testing. Consultant will issue a written punch-list to Owner and contractor. Consultant <br /> will provide one(1)site visit to review follow up work on punchlist items. <br /> Consultant will provide certification of completion and request for approval to place PWS <br /> Components into operation, in accordance with DEP form 62-555.900(9)if work is found to be in <br /> general conformance with the plans and specifications. It is assumed that a partial release to <br /> place the RO skid#7 into operation and one final clearance for the completed project will be <br /> prepared and requested. Consultant will submit forms in duplicate to the Department for a <br /> request to release the RO plant. <br /> Task 4—SCADA Implementation of RO Skid #7 <br /> The existing RO skid#7 appears to have programming and code installed for the operation of the <br /> membrane skid,however, it does not appear that it has been loop checked,or tested for <br /> integration with the other system components. This task consists of implementing the operational <br /> testing of RO skid#7 and placing it into service with the used membrane elements. <br /> KAWPB Civil"572035•Hoban Membrwte Replacementlscope\Habart Membrane Replacement 5&8 Additional services <br /> revl.docx <br /> Page 2 of 3 <br /> 212 <br />