My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/12/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
01/12/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 12:02:00 PM
Creation date
2/4/2016 12:00:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/12/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will utilize the services of Control Systems Design, who is familiar with the PLC and <br /> HMI programming. <br /> Consultant will review the completeness of existing code for all interfaces and control logic being <br /> in place and operational to support train#7 addition. Perform modifications to complete the <br /> programming to provide functionality presently available for the other trains. <br /> Consultant will provide onsite checkout and verification of instrumentation and equipment <br /> configuration and current existing train#7 operation, including input/output(UO)and <br /> functionality prior to operational startup. <br /> Consultant will perform modifications necessary to implement the configuration. <br /> Consultant will provide up to one-day of offsite remote assistance for startup and operational <br /> testing. <br /> TIME SCHEDULE <br /> Consultant will complete these tasks in a timely and mutually agreed upon schedule,and <br /> concurrently with the other related purchase order PO#71787-00. <br /> FEESCHEDULE <br /> We will provide these services in accordance with our Continuing Services Contract Agreement <br /> for Professional Services dated November 41,2014,with Indian River County. <br /> The Consultant will provide professional services for Task 1 through Task 3 on a lump sum fee <br /> basis as follows: <br /> Task No. Task Task Fee <br /> Task I U date Drawin s& Specifications S 4,100 <br /> Task 2 Permitting S 5 700 <br /> Task 3 Observation and Startup $14,780 <br /> Task 4 SCADA Implementation S 7,800 <br /> Total LumpSum Fee= S 32 80 <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project, but may be <br /> required depending on circumstances that may arise during the execution of this project. <br /> Additional services include, but may not be limited to the following: <br /> • Design drawings of any modification to the RO skids <br /> OWPki_Civil\044572035-Hobart Membrane Replarement\Scopc\tlohart Membrane Replacement 5&8 Additional Services <br /> rovl.docx <br /> Page 3 of 3 <br /> 213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.