My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-017
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 11:02:45 AM
Creation date
2/9/2016 11:02:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2016
Control Number
2016-017
Agenda Item Number
15.B.2
Entity Name
Geosyntec Consultants
Subject
Work Order No. CCNA-2014-WO No. 2
Landfill Engineering Services
Groundwater Monitoring Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br /> 12 January 2016 <br /> Page 4 <br /> A draft report will be submitted to SWDD for review and comment before a final report signed <br /> and sealed by a registered engineer is submitted to FDEP. <br /> Project management activities will include: budget and schedule tracking, invoice review, and <br /> project communications, including the preparation of a monthly progress report. The project <br /> report will include a description of the activities completed during the month and planned <br /> activities for the following month. In addition, the progress report will identify technical or <br /> administrative issues that require SWDD's attention and the current status of the budget and <br /> schedule. <br /> SCHEDULE <br /> Geosyntec will mobilize the driller to the site to install the monitoring wells within two weeks of <br /> receipt of authorization to proceed (ATP) from SWDD. It is anticipated that the installation and <br /> survey of the monitoring wells would be completed within four weeks of receipt of the ATP. <br /> Geosyntec will complete the preparation of the summary report for submittal to FDEP within <br /> four weeks of completion of the well installation. Therefore, the new monitoring well clusters <br /> would be available for sampling and testing during the second semi-annual monitoring event in <br /> July 2016. <br /> BUDGET ESTIMATE <br /> Geosyntec proposes to perform the scope of work described above on a time and materials <br /> (T&M) basis for a not-to-exceed budget of $19,944. A detailed budget estimate is provided as <br /> Attachment C. <br /> CLOSURE <br /> Geosyntec appreciates this opportunity to offer our services. If this proposal is acceptable, <br /> please indicate your agreement by signing the attached work authorization, which references this <br /> proposal. Please return one signed work authorization to Dr. Badu-Tweneboah's attention. <br /> Please call the undersigned with questions you may have as you review this proposal. <br /> Sincerely, <br /> Kwasi Badu-Tweneboah, Ph.D., P.E. <br /> Associate <br /> Attachments <br /> JL15065_Proposal for Class I Landfill Engineering Services.doc <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.