My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/7/1986
CBCC
>
Meetings
>
1980's
>
1986
>
5/7/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:01 AM
Creation date
6/12/2015 12:24:22 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/07/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6� <br />BOOK 4 PA;E . 36 <br />sandwiches for lunch only, along with a small bar and a <br />"Club Type" liquor license should be sufficient. There <br />should be limited locker room type facilities with no <br />golf club storage. The Architect will make final <br />recommendations for Commission action. <br />Cart Storage: An open building with security fencing for <br />approximately 60 carts should be adequate. <br />Maintenance Building: The course needs a combination of <br />a small maintenance facility and a sheltered area to <br />allow for storage of equipment. A separate chemical <br />storage building with ample ventilation will be required <br />by law. <br />Rain Shelters: Two small buildings are desired with <br />restroom facilities. <br />All buildings will be designed and constructed to allow <br />for future expansion. <br />MAY 21: A request will be sent to the Board for a decision on <br />engineering and construction of entrance road to golf <br />course. <br />JUNE: A recommendation will be made to the Board on type <br />management of golf course. <br />AUG/SEPT: Hire grounds crew during this period depending_on <br />construction progress. <br />CONSTRUCTION BUDGET <br />CLUBHOUSE - $250,000: Approximately 3,000 Square Feet at <br />$50.00 = $150,000. $10.0,000 <br />allowance for equipment, furnishings, <br />and professional fees. <br />MAINTENANCE BLDG - $100,000: <br />GOLF CART <br />STORAGE BLDG. <br />GOLF COURSE <br />MAINTENANCE <br />EQUIPMENT <br />- $ 75,000: <br />- $200,000: <br />Approximately 1,000 Square Feet plus <br />-chemical storage building of 500 <br />Square Feet, equipment storage, and <br />wash -down area. <br />Storage for approximately 60 carts. <br />Superintendent will make <br />recommendations. <br />Operating Budget will be submitted during process. in July. <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.