Laserfiche WebLink
Mr. Himanshu Mehta, P.E. <br /> January 6, 2016 <br /> Page 2 <br /> the power supply at the facility and the process for requesting relocation of existing power lines, <br /> if necessary. <br /> At this point, the plan should also be discussed with the County Building Department to get their <br /> input before going any further. That work is described in the next task. <br /> Deliverable: Provide Draft Concept Site Layout Plan, and updated Topographic Survey. Attend <br /> one meeting with County Solid Waste personnel. <br /> Task 2. Final Conceptual Design <br /> SCS will coordinate a meeting with the County Solid Waste personnel and the County Building <br /> Department/Planning Division personnel to discuss the draft conceptual plan. At that meeting <br /> SCS will gain a better understanding of what specific site development features are required by <br /> the County including; ratio of permeable to impermeable area,landscaping,utilities, drainage, <br /> parking, signage, and others. <br /> Following the meeting, and receipt of initial input from FP&L, SCS will prepare a revised draft <br /> conceptual plan that will incorporate the County's requirements and any other changes or <br /> additions desired. SCS will prepare at this stage a preliminary construction cost estimate, so that <br /> the cost can be compared to the County's budget. <br /> SCS will provide the County a review plan, and then meet with the County to go over any <br /> comments or changes. At this time, changes should be made, if necessary, to bring the design in <br /> under the current budget. Once the final concept is approved, SCS would then like to discus <br /> preparing additional scope and fee to provide full engineering, permitting, and construction <br /> oversight for the actual project. <br /> Deliverable: Attend one meeting each with the County Building Dept. and the County Planning <br /> Division,provide Final Concept Site Layout, complete the Administrative Approval Application <br /> Form(including Land Clearing Application, the Tree Removal Permit Application, Flood Zone <br /> and Tax I.D.) and submit to Planning for approval. <br /> SCS assymes the County will provide to SCS for this form a copy of the Owner's Deed. SCS <br /> will include the Administrative Fee($200) in our fee. <br /> FEE AND SCHEDULE <br /> SCS' fee estimate to complete Task 1 and 2 is $22,832. Because there are some unknowns at <br /> this time, including whether power lines can be moved, land use requirements, and actual usable <br /> drainage features, we will invoice monthly, on a time and materials basis for actual work <br /> completed. Our rates are as provided in the attached Fee Schedule. If the actual work goes <br /> outside the scope we will notify you and discuss if an extra fee is warranted. <br />