My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-019
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 11:09:09 AM
Creation date
2/9/2016 11:09:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2016
Control Number
2016-019
Agenda Item Number
15.B.5
Entity Name
SCS Engineers
Subject
Work Order No.3
Hazardous Waste Citizens Drop Off Center
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br /> January 6, 2016 <br /> Page 2 <br /> the power supply at the facility and the process for requesting relocation of existing power lines, <br /> if necessary. <br /> At this point, the plan should also be discussed with the County Building Department to get their <br /> input before going any further. That work is described in the next task. <br /> Deliverable: Provide Draft Concept Site Layout Plan, and updated Topographic Survey. Attend <br /> one meeting with County Solid Waste personnel. <br /> Task 2. Final Conceptual Design <br /> SCS will coordinate a meeting with the County Solid Waste personnel and the County Building <br /> Department/Planning Division personnel to discuss the draft conceptual plan. At that meeting <br /> SCS will gain a better understanding of what specific site development features are required by <br /> the County including; ratio of permeable to impermeable area,landscaping,utilities, drainage, <br /> parking, signage, and others. <br /> Following the meeting, and receipt of initial input from FP&L, SCS will prepare a revised draft <br /> conceptual plan that will incorporate the County's requirements and any other changes or <br /> additions desired. SCS will prepare at this stage a preliminary construction cost estimate, so that <br /> the cost can be compared to the County's budget. <br /> SCS will provide the County a review plan, and then meet with the County to go over any <br /> comments or changes. At this time, changes should be made, if necessary, to bring the design in <br /> under the current budget. Once the final concept is approved, SCS would then like to discus <br /> preparing additional scope and fee to provide full engineering, permitting, and construction <br /> oversight for the actual project. <br /> Deliverable: Attend one meeting each with the County Building Dept. and the County Planning <br /> Division,provide Final Concept Site Layout, complete the Administrative Approval Application <br /> Form(including Land Clearing Application, the Tree Removal Permit Application, Flood Zone <br /> and Tax I.D.) and submit to Planning for approval. <br /> SCS assymes the County will provide to SCS for this form a copy of the Owner's Deed. SCS <br /> will include the Administrative Fee($200) in our fee. <br /> FEE AND SCHEDULE <br /> SCS' fee estimate to complete Task 1 and 2 is $22,832. Because there are some unknowns at <br /> this time, including whether power lines can be moved, land use requirements, and actual usable <br /> drainage features, we will invoice monthly, on a time and materials basis for actual work <br /> completed. Our rates are as provided in the attached Fee Schedule. If the actual work goes <br /> outside the scope we will notify you and discuss if an extra fee is warranted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.