Laserfiche WebLink
Mr Himanshu H. Mehta, P E Geosyntec" <br /> 17 February 2016 consultants <br /> Page 5 <br /> Task 6 — Data Evaluation and Semi-Annual Reporting: Under this task, Geosyntec will <br /> perform data evaluation activities and reporting. The reporting includes preparation of one semi- <br /> annual report (simplified format) and one annual report for submittal to FDEP. <br /> The annual report will be consistent with the groundwater monitoring reports historically <br /> submitted to FDEP for this Site and the data evaluation activities will include database <br /> management, screening results against applicable regulatory criteria, GIS figure preparation, <br /> time trend analyses, and/or statistical data analyses. This report will be prepared following the <br /> summer groundwater sampling event. The annual report will be supported by attachments <br /> containing Chain-of-Custody sheets, field notes and observations, water sampling logs, maps, <br /> graphs, analytical results, and any other applicable materials. <br /> The semi-annual report will be a letter report with attachments, including a monitoring well <br /> location map and tables of the field and laboratory results. Data evaluation activities for the <br /> semi-annual report will include database management, screening results against applicable <br /> regulatory criteria, and summary data table preparation. This report will be prepared following <br /> the fall/winter groundwater sampling event. <br /> The draft annual and semi-annual reports will be submitted to IRC SWDD for review prior to <br /> submittal to FDEP. Each final semi-annual report will be signed and sealed by a Florida <br /> registered professional engineer or geologist. <br /> SCHEDULE <br /> Geosyntec will conduct the groundwater monitoring and reporting activities on a semi-annual <br /> basis as described herein. The semi-annual groundwater monitoring events will be tentatively <br /> conducted in June and December 2016. The draft RAPM Addendum No. 3 will be submitted to <br /> IRC SWDD for review within 60 days of receipt of authorization from IRC. <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Tasks 1 through 6 of this proposal is <br /> summarized in the following table, and a detailed budget estimate is provided as Attachment A. <br /> The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br /> project requirements, our experience gained from executing similar tasks for SWDD since 2002 <br /> at the Site, and experience with groundwater monitoring and reporting activities at similar <br /> facilities. Geosyntec will not exceed the budget estimate without prior approval and written <br /> authorization from IRC SWDD. <br /> Task 1 —Project Management $4,625 <br /> Task 2—Meetings/Regulatory Interaction $5,043 <br /> XR I6005\XR 16001.docx <br /> engineers I scientists I innovators <br />