Laserfiche WebLink
AY 2 8 1986.. Bou 64 Fk� )E 558 <br />INDIAN RIVER COUNTY <br />Date: 6/2/86 <br />Work Authorization No. 8 for Consulting Services. <br />Project No. 8 (County) 86026 (Masteller & Moler Associates, Inc.) <br />(Water) <br />I. PROJECT DESCRIPTION <br />Title: U.S. Highway #1 Water Main beginning 420' south of 10th Street and <br />commencing north to 10th Street and thence on 10th Street from U.S. <br />Highway #1 to Commerce Avenue. <br />Consulting engineering services relative to the 16" diameter water <br />main construction, consist of approximately 555' with valves, hydrants, <br />and appurtenances. Budget estimate for construction cost is $17,000.00... <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" <br />dated April 24, 1986 and specific Article numbers and paragraph <br />numbers which are listed hereinafter to describe the scope of ser- <br />vices included on this project: <br />A. Project Design Services per Article 4, paragraph 4a. and 4b. <br />B. General Services During Construction per Article 5, paragraph <br />5a. and 5b. <br />C. Supplementary and Special Services per Article 6, paragraph <br />6c., 6d., 6e., 6f., and 6g. In addition, our services shall <br />include field surveys necessary for design and preparation of <br />construction plans and assistance to the County in obtaining <br />various permits and approvals for construction (permit fees <br />to be paid by the County). <br />D. Payment for Services per Article 8, paragraph 8b., the lump <br />sum fee for A, B and C above is $1,700.00 . Payment shall be per <br />paragraph 8d. <br />APPROVED BY: SUBMITTED BY: <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />BY ih, <br />Don C. Scurlock, Jr. <br />Chairman O- <br />Date <br />APPROVED AS TO FORM AND LEGAL <br />SUFFICIENCY: <br />- aeL <br />Charles Vitunac <br />County Attorney <br />14 <br />MASTELLER & MOLER ASSOCIATES, INC. <br />By % 4 <br />ea <br />Stephe E.. Moler, P,E: <br />Execut ve Vice -President <br />Date foil � �� <br />