My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-037
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 1:25:21 PM
Creation date
3/16/2016 11:56:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/15/2016
Control Number
2016-037
Agenda Item Number
8.B.
Entity Name
Dunkelberger Engineering and Testing
Subject
Work Order #2 Old Dixie Highway Resurfacing
First Extension to Agreement
Area
Old Dixie from 71st St. to CR 510
Project Number
1138
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUNKUBERGER <br /> engineering &testing, inc. <br /> Alfe'fra con COMPANY <br /> March 2, 2016 <br /> Indian River County VF=An <br /> 1801 27t' Street <br /> ILE11 T A <br /> Vero Beach, Florida 32960 <br /> Attention: Mr. Michael Nixon P.E....via e-mail(mnixon@ircgov.com) <br /> Roadway Production Manager <br /> Subject: Materials Testing Services <br /> Old Dixie Highway Resurfacing <br /> IRC Project #1138 <br /> Indian River County, Florida <br /> Terracon Proposal No. PHB161007 <br /> Dear Mr. Nixon: <br /> Dunkelberger Engineering & Testing, Inc., A Terracon Company (Terracon) is providing <br /> this revised proposal for Materials Testing Services during construction activities at <br /> the subject project in Indian River County, Florida. As requested, we will perform the <br /> field work on a unit rate (per test) basis instead of an hourly basis. As such, a four test <br /> minimum charge per trip to the site will apply. <br /> A. PROJECT INFORMATION <br /> The subject project will include the reconstruction of the base course and asphaltic <br /> concrete structural course and shoulder widening of the of Old Dixie Highway from 71st <br /> Street to CR 510. The project length is approximately 10,070 lineal feet (1.9 miles). The <br /> contract duration is unknown to us at this time. <br /> The reconstruction (resurfacing) will involve building a 9-inch thick full-depth reclamation <br /> (FDR) base course, a 1'/2-inch thick asphaltic concrete (AC) structural course, and 1'/2- <br /> inch thick AC wearing course. The shoulder widening will involve constructing a 12-inch <br /> deep stabilization (LBR 40) 3 to 4 feet wide on each side of the existing roadway. Also <br /> associated with the project is installation of approximately 4,951 lineal feet (If) of drainage <br /> pipe, 28 inlet structures, 144 If of box culvert, and construction of four concrete endwalls. <br /> The purpose of our work is to provide quality assurance (QA) testing and inspection to <br /> check the conformity of material composition with the project specifications. <br /> Terracon Engineering&Testing,A Terracon Company 607 NW Commodity Cove Port St. Lucie, Florida 34986 <br /> P [772]343 9787 F [772] 343 9404 terracon corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.