Laserfiche WebLink
®E <br /> ecoic oam <br /> Updated 12/2014 <br /> safety measures are also addressed within the <br /> construction plans. The contractor shall install stand <br /> mounted advance construction signing in accordance <br /> with FDOT Standards for any work less than 15 feet <br /> from the edge of pavement,there shall be no <br /> excavations left open when work is not actively being <br /> performed,traffic shall be restricted to a single lane <br /> when any work encroaches the area between the <br /> centerline and 2 feet outside the edge of pavement one <br /> lane closures shall be in accordance with FDOT <br /> standards,traffic engineering shall be notified 24 hours <br /> in advance of any lane closings,all construction <br /> equipment and materials shall be stored a minimum of <br /> 15 feet from the edge of pavement and shall be <br /> protected by type II barricades with flashing lights, <br /> construction fencing used in the work area to protect <br /> equipment or excavations shall not block sight distance <br /> near intersections or drive way restorations,all right of <br /> way shall be restored in like or better condition including <br /> sidewalks, driveways and drainage,the roadway cross <br /> section shall be per IRC roadway standards, pavement <br /> shall be saw cut at ends of project and for all trenching, <br /> existing asphalt shall be removed base shall be <br /> reconstructed with proper density and roadway shall be <br /> repaved with overlay to meet standard specifications for <br /> road and bridge. See construction plans. <br /> Energy Consumption 1 No energy consumption to be affected,see scope of <br /> project. <br /> Noise- 1 The project is not a noise generating facility See <br /> Contribution to Community Noise Levels ro'ect scope <br /> Air Quality- 1 The construction plans calls for the contractor to <br /> Effects of Ambient Air Quality on Project and provide dust control such as an on site water truck. No <br /> Contribution to Community Pollution Levels negative effect on air quality anticipated after <br /> construction phase is completed. See project scope, <br /> construction plans. <br /> Environmental Design - 1 The project was designed by the County engineer and <br /> Visual Quality-Coherence, Diversity, Compatible Use is a compatible project to the given project area. See <br /> and Scale project scope,construction plans, comp Ian. <br /> Socioeconomic Code Source or Documentation <br /> Demographic Character Changes 2 The Florida Department of Health in Indian River <br /> County was contacted during the application and has <br /> advised the construction of a gravity sewer system in <br /> the area will promote community health to Indian River <br /> County citizens by improving an underserved area and <br /> vulnerable population. Also noted,the proposed project <br /> would positively impact water quality and the Indian <br /> River Lagoon. The application process also required <br /> service area income surveys and it was determined that <br /> the majority of the area are residents of low to moderate <br /> income that will have a positive benefit and <br /> improvement in quality of life. See attached letter from <br /> Dept. of Health. <br /> Displacement 1 The project will not displace individuals or families, see <br /> ro'ect-sco e. <br /> Employment and Income Patterns 2 Temporary jobs may be created in the construction <br /> hase of the project. <br /> Community Facilities and Services Code Source or Documentation <br /> Page 7 of 11 <br /> [Previously recommended EA formats are obsolete] <br />