My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-042
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2016 10:00:05 AM
Creation date
3/24/2016 10:00:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/22/2016
Control Number
2016-042
Agenda Item Number
8.B.
Entity Name
Guardian CRM Inc.
Florida Department of Economic Opportunity
Subject
Environmental Assessment to Housing and Urban Development
West Wabasso Phase II Sewer
East GiffordDrainage Project
Area
West Wabasso East Gifford
Project Number
16DB-OK-10-40-01-NO5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L)EC I'M <br /> Updated 12/2014 <br /> Educational'Facilities 1 Project will not lead to population increase. School <br /> ' board contact,comment requested and none received. <br /> See project scope, area maps, comment letters. <br /> Commercial Facilities 1 No new development involved in project and is not <br /> anticipated to adversely affect commercial facilities. See <br /> project plans,area maps. <br /> Health Care 1 No increase in population expected due to the project, <br /> there are no health care facilities in the project area. <br /> See projectplans, area maps. <br /> Social Services 1 There are no social service agencies within the project <br /> area. The project has been coordinated with the IRC <br /> SHIP department in working to provide financial <br /> assistance to individuals of low to moderate income <br /> with the cost of sewer hook ups. See project plans, <br /> area maps. <br /> Solid Waste 1 The project planned by County Engineers, construction <br /> debris will be minimal. See construction plans. <br /> Waste Water 2 Soil survey indicates the area is suitable for the <br /> installation of septic systems. County engineered plan <br /> through utility department. New sewer lines and <br /> hookups to benefit local residents. See construction <br /> tans, project scope. <br /> Storm Water 2 Drainage improvements are part of the project to benefit <br /> local residents. See project scope, construction plans. <br /> Water Supply 1 The project will have no impact on water lines. See <br /> ro'ect scope, construction plans. <br /> Community Facilities and Services Code Source or Documentation <br /> Public Safety -Police 1 The project will not create a significant burden on <br /> police. Agency has been provided project description <br /> and maps, asked for comments, none received <br /> - Fire 1 The project will not create a significant burden on fire <br /> department. Agency has been provided project <br /> description and maps, asked for comments,none <br /> received. <br /> - Emergency Medical 1 The project will not create a significant burden on <br /> emergency medical field.Agency has been provided <br /> project,description and maps,asked for comments, <br /> none received. <br /> Open Space and Recreation -Open Space 1 Project site is in the existing right of way, no open <br /> space, recreation or cultural facilities. See area maps, <br /> construction plans. <br /> - Recreation 1 Project site is in the existing right of way, no open <br /> space, recreation or cultural facilities. See area maps, <br /> construction plans. <br /> -Cultural Facilities 1 Project site is in the existing right of way, no open <br /> space, recreation or cultural facilities. See area maps, <br /> construction plans. <br /> Transportation 2 The project will not create a burden of transportation <br /> facilities in the area, improvements to be made on area <br /> roads as part of the project. See construction plans, <br /> area maps. <br /> Natural Features Code Source or Documentation <br /> Water Resources 1 The project will occur in the right of way located in a <br /> residential neighborhood. See area map,construction <br /> plans. <br /> Surface Water 2 Flood and drainage improvements are included in the <br /> project, improvement to septic and waste system also <br /> included and will improve the residential area. See <br /> construction plans, area maps. <br /> Page 8 of 11 <br /> [Previously recommended EA formats are obsolete.] <br />
The URL can be used to link to this page
Your browser does not support the video tag.