My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-042
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2016 10:00:05 AM
Creation date
3/24/2016 10:00:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/22/2016
Control Number
2016-042
Agenda Item Number
8.B.
Entity Name
Guardian CRM Inc.
Florida Department of Economic Opportunity
Subject
Environmental Assessment to Housing and Urban Development
West Wabasso Phase II Sewer
East GiffordDrainage Project
Area
West Wabasso East Gifford
Project Number
16DB-OK-10-40-01-NO5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®EJ <br /> awww oeaurr►rexr� <br /> Updated 12/2014 <br /> Unique Natural Features and Agricultural Lands 1 The project is located in a residential neighborhood, no <br /> ! unique natural features or agricultural lands. See <br /> farmland map,google earth images, area maps. <br /> Vegetation and Wildlife 1 The site requires a permit for tree removal,grubbing <br /> and land clearing and will be inspected for protected <br /> trees, mangroves and gopher tortoises. Necessary <br /> permits will be obtained if protected wildlife are found. <br /> See construction plans. <br /> Summary of Findings and Conclusions: <br /> Successful completion of the project in SA 1 — County residents in this service area are <br /> served by septic tanks. Proposed activities in this service area are installing new sewer <br /> mains, laterals and hookups. New sewer mains in the area will provide for elimination of <br /> substandard septic systems and improved health and safety conditions with the provision <br /> of public sewer services. Successful completion of the project in SA 2 — County <br /> residents in this service area are affected by flooding and poor drainage. Proposed <br /> improvements include storm water improvements through improved swales and new <br /> culverts that will convey storm water flows to an existing wet detention pond. <br /> ALTERNATIVES TO THE PROPOSED ACTION <br /> Alternatives and Project Modifications Considered [24 CFR§58.40(e), Ref. 40 CFR <br /> §1508.9] (Identify other reasonable courses of action that were considered and not selected, such as other <br /> sites, design modifications, or other uses of the subject site. Describe the benefits and adverse impacts to <br /> the human environment of each alternative and the reasons for rejecting it.) <br /> This is Phase 2 of a community plan, County Utilities determined this area to be <br /> considered for the Community Sewer System due to problems with septic systems. See <br /> design and studies in the Comprehensive Plan. <br /> No Action Alternative [24 CFR§58.40(e)] <br /> (Discuss the benefits and adverse impacts to ffie human environment of not implementing the preferred <br /> alternative). <br /> Project will improve sewage and drainage problems in the existing neighborhood. Not <br /> performing the activity will leave substandard conditions and lead to continued slum and <br /> blight conditions in an older, minority and low income neighborhood. <br /> Mitigation Measures Recommended [24 CFR§58.40(d), 40 CFR§1508.20] <br /> (Recommend feasible ways in which the proposal or its external factors should be modified in order to <br /> minimize adverse environmental impacts and restore or enhance environmental quality.) <br /> No adverse environmental conditions identified. <br /> Additional Studies Performed <br /> (Attach studies or summaries) <br /> None <br /> Page 9 of 11 <br /> [Previously recommended EA formats are obsolete.] <br />
The URL can be used to link to this page
Your browser does not support the video tag.