Laserfiche WebLink
2/17/2016 <br />Permitting Requirements <br />1. FDEP Application for Specific Permit to Construct Potable Water <br />System Components <br />2. FDEP En-,dronmental Resource Permit (ERP) <br />3. SJRWMD CUP modification <br />4. IRFWCD permit to discharge to Lateral J canal <br />5. IRC Application for Major Site Plan Approval <br />6. IRC Building Permit <br />7. IRC ROW Permits <br />8. Utility Department Utility Construction Permit (UCP) <br />9. USFWS or FWC depending on site specifics/species present <br />10. DoH setback for existing septic tanks <br />11. Possible ACOE permitting <br />Permitting Requirements -Continued <br />• ROW Dedication <br />6o foot along 12th Avenue SW. Two lanes, 5th Street SW intersection <br />improvements, sidewalks, Utility relocations <br />0 30 foot along loth Avenue SW and 7th Street SW <br />• 15% upland conservation = 10.95 acres <br />Set aside buffer can be used. Chapter 929.05(2)(a) requires a 50 foot <br />wide minimum. Keep scrub and pine <br />