My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/2016
CBCC
>
Meetings
>
2010's
>
2016
>
02/16/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:58:40 AM
Creation date
4/6/2016 10:13:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/16/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/17/2016 <br />00,210 1 WT. awl, -- <br />Conceptual Design: Reservoir <br />• 12 foot high berm, 3:1 slope <br />• Water Depth io feet when full (3 feet below land, 7 high) <br />• No liner <br />• Full Capacity 232 Million Gallons Storage <br />• Seepage & Evaporation Loss: Est. 1-2 MGD <br />• Pump from Osprey Marsh up and into reservoir <br />• Overflow to Lateral -J canal (East side) <br />• Gravity feed to Surface Water Treatment Plant (SWTP). Design to <br />prevent short cycling of water <br />• DoH setback is a concern <br />• Seepage Ditch along perimeter collect and re -pump <br />- - - ------------------------- <br />r <br />LEGEND <br />-IE <br />UJ <br />71 <br />CDM <br />Smith <br />Figure No. 2.1 <br />Conceptual Layout of Me Scuth County Reserioir Site. Oslo Road. Inclan River County <br />Fcco';:11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.