My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/2016
CBCC
>
Meetings
>
2010's
>
2016
>
02/16/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:58:40 AM
Creation date
4/6/2016 10:13:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/16/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conceptual Design: Surface Water Treatment Plant <br />• 5 MGD, up to 7.5MGD max day <br />• North of RO system. Tie into Distribution <br />• Multi -Stage Treatment System required <br />• Coagulation / Flocculation / Sedimentation <br />• microorganisms, chemicals, parasites <br />• Microfiltration/Ultrafiltration <br />• Remove High Total Dissolved Solids (TDS) — 1,000 mg/L <br />• Remove Chlorides: 400-500 mg/L <br />• By Product of Surface Water Treatment- Deep Injection Well? <br />• Demineralized Concentrate Disposal <br />• Solids from flocculation/sedimentation- dewater/odor <br />Costs <br />• Soft Costs + Construction Costs = Project Cost <br />• Design Fees, project planning, construction services, admin <br />• Permit/ Application Fees <br />• Pump Station (Osprey to Reservoir) <br />• Construction of Reservoir (berm, ditch, roads, overflow, maintenance <br />areas, emergency overflow) <br />• Surface Water Treatment Plant w/ storage tank ( pre& post filtration <br />equipment) <br />• Concentrate Disposal: Deep Injection Well <br />• Annual Operation & Maintenance (O&M) Costs <br />2/17/2016 <br />/y- 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.