SECTION 00948 - Work Change Directive <br />No. 1 <br />DATE OF ISSUANCE: 7/09/2014 EFFECTIVE DATE: 7/09/2014 <br />OWNER: Indian River County <br />CONTRACTOR: Ag-Scape Services, Inc. <br />Bid No: 2014026 <br />Project: Indian River County Public Shooting Range — Skeet and Trap Facility Improvements <br />OWNER's Contract No. 2014026 ENGINEER's Contract No. 1213 <br />ENGINEER: Indian River County <br />You are directed to proceed promptly with the following changes. <br />Description. <br />1. Install sod within the existing drainage swales. <br />2. Rebuild 3 sections of baffles. <br />3 Add blocking to strengthen the back side of the baffles and retain aggregate material. <br />4 Supplement the construction of the northern driveway connection with a minimum 6 -inch of cover <br />and 2 -inch thick top aggregate. <br />5 Secure the 2" x 8" blocking at the face of the Rifle Range Baffles with galvanized or stainless steel <br />screws. <br />Purpose of Work Change Directive: <br />The project required minor revision to complete the work. <br />1. The baffle had three sections with extensive damage which required repair. <br />2. The relocation of the maintenance access driveway required additional stabilization. <br />3 The blocking at the front of the baffles must be firmly attached <br />The following conditions shall apply - <br />The sod within the project is subject to removal and replacement pending as -built verification of grades <br />Attachments: Estimates 1378 and 1381 dated April 29, 2014 and June 9, 2014 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices: Contract Times <br />❑ Unit Prices <br />❑ Lump Sum <br />Q Other: <br />[1 By Change Order <br />Estimated increase in Contract Price - <br />$6,272.29 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Q Contractor's Records <br />Engineer's Records <br />❑ Other- <br />E] <br />therII By Change Order: <br />Estimated increase in Contract Times, 0 days <br />Substantial Completion. 60 days; <br />Ready for Final Completion- 75 days <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />O MEN <br />A ROVED: <br />--i <br />By: <br />By: <br />CONTRACTOR (Signature)ENCI <br />N�_:E - gPia ufe <br />R j NEature) / <br />Date: <br />Dat /, <br />Date: <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Rng Skeet & Trap (Action Pistol Range)Wdmim\Work Change Directives\9920 - Work 25 <br />Change Directive NI.doc <br />