My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/08/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
03/08/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 11:14:09 AM
Creation date
4/14/2016 12:56:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/08/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ag-Scape Services Inc. <br />1344 33rd ave sw <br />Vero Beach, FI 32968 <br />772-473-1072 <br />CUC 1225021 <br />I Name/Address I <br />Indian River County <br />1800 27th st. <br />Vero Beach, fl 32960 <br />IRC SHOOTING RANGE PROJECT <br />Estimate <br />Date <br />Estimate # <br />4/29/2014 <br />1378 <br />Signature <br />26 <br />Project <br />Description <br />Qty <br />Rate <br />Total <br />Deliver and install 300 SY of bahia sod in the swales and slopes for <br />300 <br />3.96 <br />1,188.00 <br />the INDIAN RIVER COUNTY SHOOTING RANGE PROJECT. <br />Expose buried culvert, clean out inside of culvert, regrade swale on <br />1 <br />1,200.00 <br />1,200.00 <br />both sides to allow positive flow through culvert from swale. <br />1) Rebuild 3 sections of baffles that had extensive damage. Extra <br />1 <br />3,039.29 <br />3,039.29 <br />labor total = $680. 1- foreman for 8 hrs @ $35 per hour = $280. 2 <br />laborers for 8 hrs @ $25 per hour each = $400 <br />2) Demo, load and haul off debris from 3 sections of baffles that <br />needed repair Total labor = $280. 1 laborer for 8 hrs @ $25 per <br />hour $280. <br />Hauling fee $100 <br />3) Blocking on back side of baffle plus longer bolts. Extra labor <br />total = $680. 1- foreman for 8 hrs @ $35 per hour = $280. 2 - <br />laborers for 8 hrs @ $25 per hour each = $400 <br />4) Jack up and install hurricane straps around all baffles after repair <br />for extra support. Total labor = $480. <br />1- foreman for 8 hrs @ $35 per hour = $280. 1 laborer @ $25 per <br />hour = $200. <br />5) Add ripped 2x8 along bottom to keep rocks in. Total labor = <br />$480. <br />1- foreman for 8 hrs @ $35 per hour = $280. 1 laborer @ $25 per <br />hour = $200. <br />6) All extra lumber, bolts, bits and any other items needed to <br />perform extra services. $662.86 <br />(receipts attached) <br />*Labor rate adjustment - $720 <br />Total cost before mark up = $2642.86 <br />7) 15% mark up on cost = $396.43 <br />Grand Total = $3039.29 <br />Total $5,427.29 <br />Signature <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.