My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/2/1986
CBCC
>
Meetings
>
1980's
>
1986
>
7/2/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:02 AM
Creation date
6/12/2015 12:35:47 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/02/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMENDATION <br />The Selection' Committee recommends that staff be authorized to begin <br />contract negotiations with the following firms in the prescribed <br />order as listed below: <br />.1) Boyle Engineering - Orlando, FL <br />2) Greiner Engineering —Orlando, FL <br />3) Reynolds, Smith and Hills Engineers - Orlando, FL <br />Once a contract is prepared, the Board of County Commissioners will <br />be requested to approve the contract and funding. <br />DISTRIBUTION --- — <br />Members of the Selection Committee <br />MOTION WAS MADE by Commissioner Lyons, SECONDED <br />by Commissioner Wodtke, that the Board authorize <br />staff to begin contract negotiations with the <br />firms in the order listed in the above memo. <br />Under discussion, Chairman Scurlock asked if any of the <br />local firms were considered, and Public Works Director Jim Davis <br />explained that some of the Focal firms participated in joint <br />ventures with larger firms on this bid due to the large scope of <br />work. <br />Commissioner Lyons advised that it was felt the larger firms <br />would have more environmental expertise in the sensitive wetlands <br />area. He noted that another important area in this project is <br />bridge construction because we may be forced to elevate a part of <br />the road and we want to be able to get it engineered as <br />inexpensively as possible. Commissioner Lyons emphasized that <br />during the interviews, these firms were told that we are looking <br />at the practical problem of overcoming the objections of the <br />people in order to get that road built and built right the first <br />time, and that it is going to be a 4 -lane divided roadway. <br />THE CHAIRMAN CALLED FOR THE QUESTION. The Motion <br />was voted on and carried unanimously. <br />25 <br />JUL 2 1986 Boor 6 F,,u 8o <br />
The URL can be used to link to this page
Your browser does not support the video tag.