Laserfiche WebLink
AMNS <br /> SECTION 2 ASSUMPTIONS AND EXCLUSIONS <br /> 1. Application fees, impact fees and any other fees required by regulatory agencies are considered a direct <br /> expense to the County. <br /> 2. The following assumptions apply to this scope of services: <br /> • The site does not contain hazardous materials. <br /> • The existing shoulder construction matches the existing roadway pavement section. <br /> • Sidewalk repair is limited to replacement of damaged sections. <br /> • Sidewalk replacement is limited to minor alignment adjustments to meet current ADA <br /> requirements including upgrades at pedestrian crossings. <br /> • The proposed facilities will not require relocation of major utility facilities, including power, <br /> communications, water, sewer and gas. Design and permitting of major utility relocation is <br /> assumed to be by the utility provider and is not included in this proposal. <br /> • Drainage, grading and utility adjustment information will be located on the roadway plan <br /> sheets. <br /> • The Contractor will be responsible for preparation and submittal of a Maintenance of Traffic <br /> (MOT)Plan to the County for approval prior to construction. No MOT details will be included <br /> in the Construction Plans. <br /> • The Contractor will be responsible for preparation and submittal of the FDEP NOI for the <br /> project prior to construction and N.O.T upon completion of construction. <br /> • The Contractor shall provide an as-built survey, prepared by a land surveyor registered in the <br /> State of Florida, to the County and Atkins. <br /> • Task 5 Bid Phase services is assumed to last approximately two months from submittal of Issue <br /> for Bid documents to the County. <br /> 3. Design and permitting of any offsite improvements,other than those identified herein, are not included <br /> in this proposal. <br /> 4. FDOT standard structures will be specified for all proposed drainage structures. The structural design <br /> of special structures that may be required to address special design conditions or conflicts is not <br /> included in this scope. <br /> 5. The following items are not included in this scope of work: <br /> • Traffic Signal Warrant studies. <br /> • Traffic Planning and traffic studies. <br /> • ITS design. <br /> • Geotechnical Investigations. <br /> • Profile Drawings of the proposed improvements. <br /> March 23,2016 <br /> Page 6 of 10 <br />