My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-062
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 11:49:22 AM
Creation date
4/20/2016 11:49:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/19/2016
Control Number
2016-062
Agenda Item Number
8.H.
Entity Name
Atkins North America Inc.
Subject
Work Order No.3 County Road 512 Project
Area
CR 512. Myrtle St. to 125th Ave.
Project Number
1305
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMNS <br /> SECTION 2 ASSUMPTIONS AND EXCLUSIONS <br /> 1. Application fees, impact fees and any other fees required by regulatory agencies are considered a direct <br /> expense to the County. <br /> 2. The following assumptions apply to this scope of services: <br /> • The site does not contain hazardous materials. <br /> • The existing shoulder construction matches the existing roadway pavement section. <br /> • Sidewalk repair is limited to replacement of damaged sections. <br /> • Sidewalk replacement is limited to minor alignment adjustments to meet current ADA <br /> requirements including upgrades at pedestrian crossings. <br /> • The proposed facilities will not require relocation of major utility facilities, including power, <br /> communications, water, sewer and gas. Design and permitting of major utility relocation is <br /> assumed to be by the utility provider and is not included in this proposal. <br /> • Drainage, grading and utility adjustment information will be located on the roadway plan <br /> sheets. <br /> • The Contractor will be responsible for preparation and submittal of a Maintenance of Traffic <br /> (MOT)Plan to the County for approval prior to construction. No MOT details will be included <br /> in the Construction Plans. <br /> • The Contractor will be responsible for preparation and submittal of the FDEP NOI for the <br /> project prior to construction and N.O.T upon completion of construction. <br /> • The Contractor shall provide an as-built survey, prepared by a land surveyor registered in the <br /> State of Florida, to the County and Atkins. <br /> • Task 5 Bid Phase services is assumed to last approximately two months from submittal of Issue <br /> for Bid documents to the County. <br /> 3. Design and permitting of any offsite improvements,other than those identified herein, are not included <br /> in this proposal. <br /> 4. FDOT standard structures will be specified for all proposed drainage structures. The structural design <br /> of special structures that may be required to address special design conditions or conflicts is not <br /> included in this scope. <br /> 5. The following items are not included in this scope of work: <br /> • Traffic Signal Warrant studies. <br /> • Traffic Planning and traffic studies. <br /> • ITS design. <br /> • Geotechnical Investigations. <br /> • Profile Drawings of the proposed improvements. <br /> March 23,2016 <br /> Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.