My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-442 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-442 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2016 12:43:20 AM
Creation date
4/21/2016 1:19:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/04/1979
Control Number
2008-442
Agenda Item Number
Received 5/20/2008
Entity Name
Florida East Coast Railway
Subject
Railroad Reimbursement Agreement Grade Crossing and Traffic Control
Area
Hobart Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORM 7ZZ-05 STATE OF FLORIDA 616 ARtTPI�i 7'>>;3F TRANSPORTATION <br /> 7-77 DIVISION OF ROAD(:;�ERATIONS <br /> COUNT', SECTION UTILITY JOB hip. STATE ROAD Pip. COUNTY NAME P CEL Rl' J4 Np. `,A�lalt}... <br /> RR 000 6507 _ Hobart Rd. Indian RiVer - SOS-0004(34) <br /> AGENCY <br /> FLORIDA FAST COAST RAILWAY COMPANY <br /> A. Facilities Involved KDetail as to Type and Location): Type ILII at-grade at Ry MP: 224.7 on, <br /> Hobart Rd. near Wabasso, Fla. <br /> Crossing o. : 272178-E1 <br /> R. Relocation Work Anticipated Describe and Relate to Location on Pro'ect : Reconstruct existing <br /> Crossing to accommodate don Roadway in accordance with Department's <br /> index 4RR-4I <br /> ', Anticipated Relocation Schedule Rased on normal schedule acrd day' ror � <br /> ITEM CALENDAR DAYS ESTINIATED <br /> Preliminary Engineering lu <br /> Material. Procurement 20 <br /> Right of Way Acquisition <br /> Contract Negotiations (for utility/railroad work <br /> {ether <br /> Construction actual utility/railroad;relocation time at job site] t <br /> ESTIMATEDIA I IU I TOTAL 65 Days <br /> ADJUSTED UTILITY/RAILROAD RELOCATION PER.IO <br /> flow for concurrent activities) EST I TED TNU I IU I TOTAL Days <br /> e,� Highway Contract Special Previsions <br /> D. S ecial Notations to be included in Highway Contract Special Provisions: <br /> E.. This AGENCY ro oses to commence actual relocation and/or heck one); <br /> El prior to highway contract advertisement, and relocation should be complete by date of <br /> preconstruction conference. <br /> concurrently with project advertisement. <br /> coneurrentl , with commencement of highway construction,, <br /> The above data is based on construction plans and schedules prepared by the DEPART TENT and, therefore, i <br /> furnished for informational purposes only. This AGENCY is not responsible for circumstances beyond its normal <br /> control, However, the AGENCY will endeavor to fully cooperate with the DEPART IEI T, and its Contractor, in, <br /> clearing, the project right of ways s expeditiously as possible, The AGENCY"S Field Representatives can be contacted <br /> at. Telephone 'umber: <br /> SUIS.NUTTED FOR THE AGENCY BY: R. . _ Date. 12/28/78 <br /> Mike d. Dross '" _ <br /> I EPART IENT.AL APPROVAL R / �I hate: <br /> • 0614imp neer <br />
The URL can be used to link to this page
Your browser does not support the video tag.