My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-442 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-442 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2016 12:43:20 AM
Creation date
4/21/2016 1:19:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/04/1979
Control Number
2008-442
Agenda Item Number
Received 5/20/2008
Entity Name
Florida East Coast Railway
Subject
Railroad Reimbursement Agreement Grade Crossing and Traffic Control
Area
Hobart Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORM izvos STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br /> 7.71 DIVISION Of RdAO OPVRATIONS <br /> FACE r OF I UTIL,ITY/RAILROAD RELOCATION SCHEDULE <br /> COUNTY TION L TlLtTV 308 NO. STATE ROAD NO. COUNTY NAME PARCEL.&R/W JOB NO. PAP No. <br /> 88 004 6607 Hobart Rd;. Indian River' I - SOS-0004(34) <br /> AGENCY <br /> FLORIDA CAST COAST RAILWAY COMPANY <br /> A. Facilities Involved Detail as to Type and location ., Type I, E' as s IR.Y.- warning devices <br /> on Hobart Rd. at Ry. 220.7 near W b s n, Flat <br /> Crossing No. : 272170-U <br /> B. Relocation Fork Anticipated Describe and Prelate to Location on o ect : Relocate existing <br /> warnin.g devices to accommdate widening of Roadway in nrd n e with Department's <br /> index I7 82 ` ,, <br /> C. Anticipated Relocation Schedule a d on normal schedule and 5-day work 2reek <br /> ITEM CALEaPAR 4DYS ESTIMATED <br /> Preliminary Engineering <br /> Material Procurement 10 <br /> Right of'l ay Acquisition <br /> Contract Negotiations(for utility/railroad work 30 <br /> Other <br /> Cortstruction (actual utility/railroad relocation time at job site) f <br /> ESTIMATED MAXIMUMTOTAL 48 Days <br /> ADJUSTED UTILITY/RAILROAD RELOCA PERIOD <br /> IO <br /> (Allow for concurrent activities) ESTIMATED MINIMUM TOTAL 48 flays <br /> -See Highway Contract Special Provisions <br /> D. Special Notation to be included in Highway-Contract Special Provisions <br /> ;. This All d"ustrnent work: Check ones <br /> prior to highway contract advertisement, and relocation should be . - complete by date of <br /> preconstruction conferences <br /> concurrently with project advertisement. <br /> 135 concurrentll with,commencement of hi way construction. <br /> The above data is based on construction plans and schedules prepared by the DEPARTMENT, and, therefore, is <br /> furnished for informational purposes only. This AGENCY is not responsible for circumstances beyond its normal <br /> control. However, the AGENCY will endeavor to fully cooperate with the DEPARTMENT, and its Contractor, in <br /> clearing the project right of way as expeditiously as possible. The A+ E NCY S Ficid Representatives can be contacted_ <br /> at Telephone lumber, <br /> SUBMITTED FOR TIDE AGENCY BY: 1. E. Web - Sli t. &C-FEC ate: •" <br /> Mite J. Cress DEC 2 C 1978 <br /> DEPARTMENTAL APP D" AL BY. ate. <br /> rilit�ngineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.