Laserfiche WebLink
In order to execute this project in the most cost effective manner, with the most aggressive <br />schedule, Schulke, Bittle & Stoddard, L.L.C. will: <br />- Rely on building plans and building department records obtained from the IRC utility <br />department and IRC building department for as -built conditions of the WWTP <br />components. <br />- Utilize the IRC utility department standard bid documents and construction contract, <br />which documents shall be provided in an editable format by IRC to SBS. <br />SBS may retain consultant(s) at its discretion, which may include one or more companies <br />whose primary occupation is providing and installing lining systems for existing utility <br />structures. SBS has budgeted up to $1,000.00 for these services. <br />2 of 2 <br />