Laserfiche WebLink
Mr. Himanshu Mehta, P. E. <br />30 December 2014 <br />Page 8 <br />Following submittal of the ERP Renewal Application, Geosyntec will meet with FDEP <br />Stormwater Section in West Palm Beach to present and discuss the ERP renewal application. <br />Geosyntec will provide FDEP with written responses to RAIs throughout the course of the <br />permit review process. For the purpose of the budget estimate, Geosyntec has estimated two <br />responses will be required. <br />Phase 4 — Landfill Operations Support Services <br />Under this phase, Geosyntec will provide landfill operations support services to SWDD <br />including the following: <br />reviewing and updating the existing SWPPP and SPCC Plan prepared by RSI for <br />inclusion in the IRCL Operations and Training Plan; <br />design of new landfill access road for waste placement in the active cells of the Class I <br />Landfill; <br />evaluation for the need for a retaining wall at the existing ,lift station; <br />other landfill operations support services as requested by RSI though SWDD. <br />SCHEDULE <br />Geosyntec has prepared a preliminary schedule; for performing work outlined, in :Lt.his2 <br />proposal <br />and: is" included`as Attachment A The schedule, as presented; assumes a? start date, of January <br />2015 Geosyntec anticipates submitting the. Solid Waste Permit Renewal,Appli€€cation to .t',,„DP <br />by 25 June 2015. The' ERP' Renewal Application is anticipated to be %submittedIto FDEP by12; <br />May 2015. Geosyntec has' assumedf that the required permits will be obtained within about two <br />months' of submission to FDEP Responses to FDEP` comments will be performed, during this. <br />approximately two month period Therefore, it is anticipated; that the! permit renewals for the <br />Project will be issued before 30 July 2015 for the ERP and 27 August 2015 for, the solid waste <br />permit <br />Geosyntec will work with SWDD,to refine the project schedule and: set the milestones necessary <br />to meet the ,needs of the Project. Throughout the duration of the Project, Geosyntec will work <br />diligently to meet those milestones and the schedule developed for the Project. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Phases 1 through 4 o . this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment B. <br />JL14065_Proposal for Class I Landfill Engineering Services REVISED FINAL <br />engineers 1. scientists I `innovators <br />