My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-010
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 11:01:06 AM
Creation date
4/25/2016 11:37:14 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />30 December 2014 <br />Page 7 <br />Task 2.2: Force Main Design and Permitting <br />Under this phase Geosyntec will design a new force main for leachate transmission from Cells 2 <br />through 4 of the Segment 3 Expansion at the IRCL facility. Leachate from Cell 1 of Segment 3 <br />Expansion, the Segment 1 vertical expansion, Infill Area and Segment 2 is currently transmitted <br />to the West Regional Wastewater Treatment Plant through an existing 4 -inch diameter PVC <br />force main. It is anticipated that the new force main will have stub -outs for future Cells 2 <br />through 4 of Segment 3 Expansion, run parallel to the existing force main, and connect to the <br />West Regional Wastewater Treatment Plant. However, Geosyntec will coordinate with SWDD <br />and RSI to explore the need to connect Cell 1 of Segment 3 Expansion to this new force main if <br />necessary. <br />The deliverable for this task will consist of a calculation package for design of the new force <br />main with 'necessary drawings including plan, alignment and details of the new force main. <br />Geosyntec will include the force main design in the permit renewal application package to :.the <br />FDEP for their review. <br />Task 13: Response to Regulatory, Comments: <br />Following; submittal 'of the Renewal Permit Application, Geosyntec will meet with FDEP Solid <br />Waste Section,in Tallahassee to present and discuss the .application'package This Meeting may <br />be held via teleconference in order to reduce overall costs to the project. Geosyntec will provide. <br />FDEP with,written responses, to requests for additional information (RAIs) throughout the course: <br />of the renewal permit review process For the purpose of the budget estimate, Geosyntec ,has <br />estimated two responses to FDEP RAIs will be required.,' <br />Under this phase, Geosynteclwill prepare an ERP renewal application; for submittal to FDEP A <br />re a lication <br />p = pp 'meeting will t be scheduled with<'the Storrnwater Section !of FDEP Southeast <br />District office in West Palm` Beach, to review the permitting° requirements Geosyntec will <br />prepare designs for the' perimeter ditches to convey stormwater runoff from a 25 year, 24-hour, <br />storm and'iohandle the storinwater runoff fromthe closed portions of the Class I Landfill. <br />Geosyntec will prepare the renewal application for the .IRCL facility ERP. The application will <br />include the engineering reports and drawings in support of the renewal permit application in <br />accordance with Chapter 62-330 F.A.C. Geosyntec will provide one (1) electronic and one (1) <br />hardcopy of the ERP renewal application to FDEP Southeast District and two (2) copies (1 <br />electronic and 1 hardcopy) to, SWDD. Activities required for the compilation, reproduction and <br />distributionof. the ERP renewal application package are included in this phase. <br />JL14065_Proposal for Class I Landfill Engineering Services REVISED FINAL <br />efA7gilVei&Cit <br />ors: <br />
The URL can be used to link to this page
Your browser does not support the video tag.