Intergenerational Recreation Center Page -5- <br />AACE Proposal No. P14-392 <br />Vertical Construction Testing <br />In -Place Soil Density Testing• <br />► Recreauon Center Wall Footings; 50 density tests @ $23.00/test $1,150.00 <br />• Isolated Footings, 20 density tests @ $23 00/test . $460 00 <br />► Misc. Conduit Trench Backfill; 25 density tests @ $23 00/test $575.00 <br />Concrete Testing. <br />It is difficult to accurately predict the number of concrete specimens needed for QA/QC for a project such as the <br />Intergenerational Recreation Center since the number of tests is largely based on the number of pours (i.e., 1 set of cylinders <br />for a 50 cubic yard pour vs. 5 sets of cyhnders for five separate 10 cubic yard pours, etc.). Without knowing the Contractor's <br />methodology or pour schedule for this work element, we largely base the concrete testing budget on our expenence with <br />similar projects. For this purpose, we have assumed the following. <br />(1) Tilt -Up Panels: 86 panels (avg. width/height: 30'/20' x 4" = 7.5 yd3 per panel, pouring 10 panels/day, 2 sets of <br />specimen/pour) <br />► 20 sets of 4 cyhnders for compressive strength testing @ $85.00/set $1,700.00 <br />(2) Recreation Center Columns. <br />► 5 sets of 4 cylinders for compressive strength testing @ $85.00/set $425.00 <br />(3) Recreation Center Slab (Assume 4 pours, 2 sets/pour) <br />► 8 sets of 4 cylinders for compressive strength testing @ $85.00/set $680.00 <br />(4) Semor Technician for Standby during larger pours, extra slumping, etc. <br />► 25 hours @ $55.00/hour $1,375 00 <br />Vertical Construction Testing Subtotal: $6,365.00 <br />TOTAL ANTICIPATED TESTING BUDGET (SITE WORK + VERTICAL) $57,115.00 <br />